SINKRONISASI TRANSFORMATOR MENGGUNAKAN UNIT GARDU BERGERAK METODE TANPA PADAM DI PT.PLN (Persero) BINTARO

SYAHFIKRI, RAFLI and Pasra, Nurmiati and Hajar, Ibnu (2020) SINKRONISASI TRANSFORMATOR MENGGUNAKAN UNIT GARDU BERGERAK METODE TANPA PADAM DI PT.PLN (Persero) BINTARO. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR_RAFLI SYAHFIKRI_201771140__RAFLI SYAHFIKRI.pdf] Text
PROYEK AKHIR_RAFLI SYAHFIKRI_201771140__RAFLI SYAHFIKRI.pdf
Restricted to Registered users only

Download (944kB)

Abstract

Sejalan dengan peningkatan kebutuhan akan energy listrik , trafo adalah
salah satu peralatan yang penting dalam mendistribusikan energi listrik. Trafo
harus terus diinspeksi kondisi dan keandalannya harus terus dalam keadaan baik
. Pemanfaatan UGB ( Unit Gardu Bergerak ) juga merupakan bagian dalam
meningkatkan mobilitas dalam pengadaan energi listrik secara bebas.
Pelaksanaan sinkronisasi trafo adalah salah satu cara meningkatkan keandalan
dan penaikan mutu dalam mejaga lifetime dari penggunaan trafo .Demi
menunjang keandalan pendistribusian listrik, dalam teknis pekerjaan dilakukan
secara PDKB (Pekerjaan Dalam Kondisi Bertegangan) metode pelaksanaan
tanpa padam .Memperhatikan vektor group trafo adalah hal yang penting untuk
memastikan jenis trafo sama, seperti trafo Dyn5 yang dapat disinkron dengan
trafo sejenis. Hal lain juga dilakukan perhitungan nilai toleransi dua penyulang
yang dilaukan pada saat pelaksanaan sinkron agar pelaksanaan bejalan baik
Besar nilai toleransi dihitung selama proses pekerjaan pada pukul 11:00, 12:00,
dan 13:00 yakni sebesar 8,57%, 4,52%, 1,5% penyulang pertama dan 1,006%,
7,55%, dan 6,54% penyulang kedua, nilai ini berada di bawah batas toleransi
tegangan. Sedangkan untuk persentase perhitungan frekuensi yakni sebesar
1,001%, 2,004%, 0,4% penyulang pertama dan 1,8%, 1,4%, 1,2% pada
penyulang kedua, nilai ini berada di bawah batas toleransi frekuensi ±0,2Hz.
Setelahnya memastikan besar tegangan pada rak Tr sesuai dengan batasan
tolernasi PLN sebesar +10% dan -5%. Terakhir memastikan jenis kabel yang
digunakan memiliki resitansi kecil seperti niali perbandingan antara antar kabel
NYY1x240mm2 dengan AAAC 240mm2 dimana nilai resistansi kabel NYY
1x240mm2 memiliki nilai hambatan yang lebih kecil yakni sebesar 0,00000314
ohm/mm2 pada hubungan dari trafo existing ke rak Tr sedangkan AAAC 240mm2
sebesar R=0,00000520833 ohm/mm2. Sehingga konduktifitas NYY lebih baik
daripada AAAC yang memiliki hambatan kabel lebih besar.

In line with the increasing need for electrical energy, the transformer is one
of the important equipment in distributing electrical energy. The transformer must
continue to be inspected, and its reliability must continue to be in good condition. Utilization of UGB (Mobile Substation Unit) is also a part in increasing mobility in the provision of electricity freely. The implementation of transformer
synchronization is one way to improve the reliability and quality improvement in
maintaining the lifetime of the transformer use. To support the reliability of
electricity distribution, in technical work is carried out in a PDKB (Work in Stressful Conditions) implementation method without outages. Paying attention to the transformer group vector is important to ensure the same type of transformer,
such as Dyn5 transformer that can be synchronized with similar transformers.
Another calculation is also done to the tolerance value of two feeders that are
carried out during synchronization so that the implementation runs well. Large
tolerance value is calculated during the work process at 11:00, 12: 00, and 13: 00
that is 4.18%, 4.57%, 4.85% the first feeder and 4.9%, 4.28% and 4.37% the
second feeder, this value is below the voltage tolerance limit ± 5%. As for the
percentage of frequency calculation that is equal to 0.3%, 0.2%, 0.36% of the first
feeder and 0.22%, 0.26%, 0.28% in the second feeder, this value is below the
frequency tolerance limit ± 0.2Hz. Afterwards, make sure that the voltage on the
Tr rack is in accordance with the PLN tolerance limit of + 10% and -5%. Finally,
ensure the type of cable used has a small resistance, such as the ratio between
NYY1x240mm2 cable with AAAC 240mm2 where the value of NYY 1x240mm2
cable resistance has a smaller resistance value of 0.00000314 ohms / mm2 on
the connection from the existing transformer to Tr rack while AAAC 240mm2 of
R = 0.00000520833 ohms / mm2. So that NYY conductivity is better than AAAC
which has greater cable resistance.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Trafo , toleransi , Ugb , Resistansi , Vektor Group Transformer, tolerance, Ugb, Resistance, Group Vector
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Nurul Hidayati
Date Deposited: 14 Jan 2026 02:43
Last Modified: 14 Jan 2026 02:43
URI: https://repository.itpln.ac.id/id/eprint/4830

Actions (login required)

View Item
View Item