ANALISIS FAKTOR CONSTRUCTION WASTE TIME DENGAN METODE VALUE STREAM MAPPING PADA PERKERJAAN KOLOM GEDUNG BERTINGKAT (Studi Kasus Proyek North Point Nava Park)

Ridwan M, Almadea and Sepriyanna, Irma (2021) ANALISIS FAKTOR CONSTRUCTION WASTE TIME DENGAN METODE VALUE STREAM MAPPING PADA PERKERJAAN KOLOM GEDUNG BERTINGKAT (Studi Kasus Proyek North Point Nava Park). Diploma thesis, ITPLN.

[thumbnail of Almadea Ridwan M 201721112.pdf] Text
Almadea Ridwan M 201721112.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Kegiatan proyek konstruksi merupakan suatu kegiatan yang berlangsung dalam jangka waktu terbatas dan alokasi sumber daya tertentu. Waste Construction merupakan pemborosan yang tidak akan meningkatkan nilai produk akhir, pemborosan bahan dilokasi proyek, pembelian bahan yang berlebihan serta tenaga kerja yang berlebih yang dapat mengakibatkan waste time construction. Tujuan dari pengamatan ini untuk mengetahui faktor pemborosan waktu (waste time) pada pekerjaan kolom di proyek serta untuk mengetahui waktu normal dan waktu baku standar pekerjaan berdasarkan value stream mapping. Factor pemborosan waktu (waste time) dalam pekerjaan kolom dapat disebabkan oleh pekerja dan peralatan. Adapun, waktu standar untuk melaksanakan pekerjaan yang sebenarnya diperoleh dari perhitungan yaitu pada pekerjaan kolom sekitar 921 menit dengan asumsi 8 jam waktu kerja per-hari maka pelaksanaan normal pekerjaan kolom selama 2 hari. Besar pemborosan waktu (waste time) yang diperoleh berdasarkan value stream mapping pada pekerjaan kolom sebesar 18%.

Construction project activity is an activity that lasts for a limited period of time and is allocated a certain resource. Construction waste is a waste that will not increase the value of the final product, waste of materials at the project site, purchase of excessive materials and excessive labor that can result in waste construction time. The purpose of these observations to determine a waste of time(wastetime)on field work on the project as well as to determine the normal time and standard time standard based onwork. value stream mapping. Factors wasting time (waste time) in column work can be caused by workers and equipment. Meanwhile, the standard time to carry out the actual work is obtained from the calculation, namely the column work is about 921 minutes assuming 8 hours of work time per day, the normal implementation of column work is 2 days. The wastage of time (waste time) obtained based on the value stream mapping on column work was 18%.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: kolom, waste time, value stream mapping.. column waste time, value stream mapping.
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 02 Sep 2025 17:53
Last Modified: 02 Sep 2025 17:53
URI: https://repository.itpln.ac.id/id/eprint/492

Actions (login required)

View Item
View Item