Abstract
Saat ini kemajuan teknologi pembangunan konstruksi mengalami perkembangan baik dari pengolahan bahan campuran beton, peralatan pengecoran, maupun metode pengecorannya. Pada pengolahan pencampuran beton terdapat beberapa metode pembuatannya seperti metode site mix yaitu metode pencampuran beton olah di tempat, dan metode ready mix yaitu pencampuran beton yang dilakukan di Batching Plant. Tujuan penelitian ini adalah untuk mengetahui produktifitas dan efektifitas alat pengecoran dengan metode ready mix dan site mix pada proses pengecoran pondasi Tower SUTET. Dari analisa diperoleh hasil produktifitas pekerjaan cor leg tower yang bervolume 48,90 m³ dengan metode ready mix adalah 15,60 m³/jam sedangkan site mix adalah 3,3 m³/jam. Nilai efektifitas yang diperoleh dengan ready mix adalah 0,28, sedangkan nilai efektifitas site mix sebesar 2,18.
Currently, the progress of construction development technology is experiencing developments both from the processing of concrete mixture materials, casting equipment, and casting methods. In the processing of concrete mixing, there are several manufacturing methods such as the site mix method, namely the method of mixing concrete on site, and the ready mix method, namely the mixing of concrete carried out at the Batching Plant. The purpose of this study was to determine the productivity and effectiveness of the foundry using the ready mix and site mix methods in the SUTET Tower foundation casting process. From the analysis, it is obtained that the productivity of the cast leg tower work with a volume of 48.90 m with the ready mix method is 15.60 m/hour while the site mix is 3.3 m/hour. The effectiveness value obtained with the ready mix is 0.28, while the site mix effectiveness value is 2.18
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Produktifitas, Efektifitas, Ready Mix, Site Mix Productivity, Effectivity, Ready Mix, Site Mix |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 02 Sep 2025 17:57 |
Last Modified: | 02 Sep 2025 17:57 |
URI: | https://repository.itpln.ac.id/id/eprint/493 |