SITOMPUL, JOSUA ULI SYAHPUTRA and Setiadi, Bambang and Sulistiyo, Eko (2024) PERHITUNGAN EFISIENSI HIGH PRESSURE TRANSFER PUMP 1A1 SEBELUM & SESUDAH DI LAKUKAN REVERSE ENGINEERING BLOK 1 PT. PLN NUSANTARA POWER UP MUARA KARANG. Diploma thesis, ITPLN.
![[thumbnail of PROYEK AKHIR_JOSUA ULI SYAHPUTRA SITOMPUL_202172005.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
PROYEK AKHIR_JOSUA ULI SYAHPUTRA SITOMPUL_202172005.pdf
Restricted to Repository staff only
Download (5MB)
Abstract
Pembangkit Listrik Tenaga Gas Uap (PLTGU) merupakan pembangkit listrik yang menggunakan bahan bakar gas dan memanfaatkan kembali gas buang dari turbin gas untuk memanaskan pipa pipa yang berada di HRSG (Heat Recovery Steam Generator) untuk menghasilkan uap dan memutar steam turbin (Turbin Uap). PLTGU Muara Karang merupakan Pembangkit Listrik Tenaga Gas dan Uap yang memiliki sebesar 2.154 MW. Salah satu komponen penting yang digunakan pada PLTGU Muara Karang yaitu High Pressure Transfer Pump. High Pressure Transfer Pump (HPTP) adalah pompa yang berfungsi
memindahkan air dari LP drum melalui HP economizer menuju ke HP drum, dengan menggunakan sistem otomatis. Tipe dari high pressure transfer pump yang ada di PLTGU Muara Karang adalah Type MC100-300/9. Untuk menjaga efisiensi pompa High Pressure Transfer pump perlu dilakukan perawatan atau
penggantian pada komponen. Pada High Pressure Transfer pump telah dilakukan penggantian komponen pada shaft pompa dengan menggunakan metode reverse engineering. Diketahui efisiensi sebelum reverse engineering pada poros pompa besar efisiensinya adalah sebesar 66,7%, dan setelah dilakukannya reverse engineering pada poros pompa besar efisensi nya adalah sebesar 60%. Dapat disimpulkan perbandingan efisiensi pompa sebelum dan sesudah dilakukan reverse engineering pada poros pompa adalah sebesar 6,7%.
Steam Gas Power Plant (PLTGU) is a power plant that uses gas fuel and reuses the exhaust gas from the gas turbine to heat the pipes in the HRSG (Heat Recovery Steam Generator) to produce steam and rotate the steam turbine. PLTGU Muara Karang is a gas and steam power plant that has a capacity of 2,154 MW. One of the important components used in the Muara Karang PLTGU is the High Pressure Transfer Pump.
High Pressure Transfer Pump (HPTP) is a pump that functions to move water from the LP drum through the HP economizer to the HP drum, using an automatic system. The type of high pressure transfer pump in PLTGU Muara Karang is Type MC100-300/9. To maintain the efficiency of the High Pressure Transfer pump, maintenance or replacement of components is required. The High Pressure Transfer pump has replaced components on the pump shaft using the reverse engineering method. It is known that the efficiency before reverse engineering on the large pump shaft is 66.7%, and after reverse engineering on the large pump shaft the efficiency is 60%. It can be concluded that the comparison of pump efficiency before and after reverse engineering on the pump shaft is 6.7%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Efisiensi, High Pressure Transfer Pump, Pompa, Reverse Engineering |
Subjects: | Bidang Keilmuan > Maintenance Bidang Keilmuan > Mechanical Engineering Bidang Keilmuan > Power generation Bidang Keilmuan > Pump Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Vokasi > D3 Teknologi Mesin |
Depositing User: | Yudha Formanto |
Date Deposited: | 03 Sep 2025 02:55 |
Last Modified: | 03 Sep 2025 03:21 |
URI: | https://repository.itpln.ac.id/id/eprint/497 |