HADINOTO, BENYAMIN and Samsurizal, Samsurizal (2019) PENYELESAIAN TRANSFORMATOR YANG OVERLOAD TERHADAP KUALITAS DAYA DI PT PLN (PERSERO) UP3 PONDOK GEDE. Diploma thesis, ITPLN.
1. COVER TUGAS AKHIR ben.pdf
Download (46kB)
2. Lembar pengesahan, Daftar isi, Abstrak.pdf
Download (165kB)
3. BAB 1-5.pdf
Restricted to Registered users only
Download (786kB)
Abstract
Dengan seiring laju pertumbuhan penduduk yang setiap tahunnya semakin tumbuh dengan pesat dapat dilihat dari data kependudukan, tercatat di tahun 2015 jumlah penduduk yang ada di wilayah pondok gede sebesar 2.733.240 jiwa dan di tahun 2019 mencapai angka sebesar 3.013.851 jiwa, menurut badan pusat statistik. Dan ini berpengaruh pada kebutuhan listrik juga yang setiap tahunnya semakin bertambah tercatat pada tahun 2015 324.175 dan di tahun 2019 kebutuhan listrik sudah mencapai 359.098. Pada Gardu distribusi dengan nomor JS 190, diketahui terjadi kenaikan pembebanan pada transformator yaitu dengan presentasi pembebanan sebesar 95,75% dari kapasitas transformator sebesar 200 kVA. Untuk dapat memperbaiki kondisi seperti ini, PT PLN (Persero) telah berupaya untuk uprating transformator atau menambah daya transformator dengan kapasitas yang lebih besar dari 200 kVA menjadi 400kVA. Setelah uprating transformator diperoleh besar pembebanan 52,75%. Dari hasil tersebut, uprating transformator merupakan salah satu metode yang dapat digunakan untuk mengatasi overload pada transformator.
With over population growth rate annually growing by leaps and bounds can be seen from the data on population, recorded in 2015, the number of residents in the region amounted to 2.733.240 soul and the big lodge in 2019 reached the figure of 3.013.851 people, according to agency statistics center. And this affects the demand for electricity is also increasing every year recorded in 2015 324.175 and in 2019 the demand for electricity has reached 359.098. At the distribution substations with JS number 190, known to an increase in load on the transformer is by presentation of 95.75% loading of transformer capacity of 200 kVA. In order to improve these conditions, PT PLN (Persero) has sought to add power uprating transformer or transformers with a capacity greater than 200 kVA to 400kVA. Having obtained a large transformer load uprating 52.75%. From these results, uprating transformer is one method that can be used to cope overload on the transformer.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Uprating Transformator, Transformator Overload. Uprating Transformer, Transformer Overload. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 12 Feb 2026 08:16 |
| Last Modified: | 12 Feb 2026 08:16 |
| URI: | https://repository.itpln.ac.id/id/eprint/5012 |