SYARIFUDIN, AHMAD and Qosim, Muchamad Nur (2019) DETEKSI PARTIAL DISCHARGE PADA KABEL XLPE DALAM RANGKA PEMELIHARAAN PADA SKTM DI PT. PLN (PERSERO) UNIT(UP3) MARUNDA. Diploma thesis, ITPLN.
Tugas Akhir Ahmad Syarifudin.pdf
Restricted to Registered users only
Download (6MB)
Abstract
PT.PLN (PERSERO) merupakan Badan Usaha Milik Negara (BUMN) yang memiliki otoritas penuh dalam menjaga kontinuitas pendistribusian pasokan energi listrik kepada pelanggan. Salah satu indicator kinerja utama kehandalan pada sistem distirbusi disebut SAIDI & SAIFI. Salah satu gangguan yang sering terjadi yakni pada kabel tanah untuk sistem tegangan menengah atau biasa disebut SKTM (saluran kabel tegangan menengah) yang disebabkan adanya gangguan eksternal dan internal. Hal ini tentu merupakan sebuah tantangan untuk mengurangi jumlah gangguan sehingga bisa meningkatkan keandalan sistem distribusi. Faktor penyebab gangguan internal pada kabel bawah tanah biasanya disebabkan oleh aktifitas partial discharge. PT.PLN (PERSERO) UP3 Marunda memanfaatkan asessment kabel untuk menjaga keandalan penyaluran sistem tenaga listrik tegangan menengah khususnya pada kabel SKTM, karena perlu untuk mendeteksi kondisi kabel yang beroperasi. Asessment kabel ini menggunakan parameter standar PUSLITBANG. Setelah mengetahui kondisi kabel tersebut PLN harus menindak lanjuti kondisi kabel sesuai kategori kerusakan yakni baik, degradasi, buruk, dan kritis.
PT. PLN (PERSERO) is a State-Owned Enterprise (BUMN) that has full authority in maintaining continuity in the distribution of electricity supply to customers. One of the main performance indicators of reliability in the distribution system is called SAIDI & SAIFI. One of the problems that often occurs is in the ground cable for medium voltage systems or commonly called SKTM (medium voltage cable channel) caused by external and internal interference. This is certainly a challenge to reduce the amount of interference so that it can improve the reliability of the distribution system. Factors causing internal disturbances in underground cables are usually caused by partial discharge activities. PT. The Marunda UP3 PLN (PERSERO) utilizes a cable assessment to maintain the reliability of the medium voltage power system distribution, especially in the SKTM cable, because it is necessary to detect the condition of the operating cable. This cable assessment uses the standard PUSLITBANG parameters. After knowing the condition of the cable, PLN must follow up on the condition of the cable in the category of damage, which is good, degradation, bad and critical.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Partial Discharge, Saluran Kabel Tegangan Menengah (SKTM), SAIDI, SAIFI. Partial Discharge, Medium Voltage Cable Channel (SKTM), SAIDI, SAIFI. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 12 Feb 2026 09:07 |
| Last Modified: | 12 Feb 2026 09:07 |
| URI: | https://repository.itpln.ac.id/id/eprint/5019 |
