Julian, Bintang Putra and Kustanrika, Irma Wirantina (2021) PENERAPAN SOFT SYSTEM METHODOLOGY TERHADAP ALUR PENDISTRIBUSIAN MATERIAL BAJA TULANGAN UNTUK MENINGKATKAN EFISIENSI WAKTU PELAKSANAAN KONSTRUKSI (Studi Kasus: Proyek North Point Navapark, Tangerang). Diploma thesis, ITPLN.
![[thumbnail of BINTANG PUTRA JULIAN_201721006.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BINTANG PUTRA JULIAN_201721006.pdf
Restricted to Repository staff only
Download (2MB)
Abstract
Dalam suatu proyek konstruksi, keterlambatan kedatangan material baja tulangan tulangan mempengaruhi waktu pelaksanaan, maka dari itu, distribusi material baja tulangan di lapangan menjadi salah satu faktor yang mempengaruhi kecepatan ketersediaan material baja tulangan untuk dikerjakan. Pada Proyek North Point Navapark, alur distribusi material baja tulangan tulangan belum memiliki tahapan dan metode yang efisien dalam segi waktu. Soft System Methodology (SSM) merupakan suatu metode pendekatan yang dapat dilakukan untuk membuat pemodelan alur distribusi material baja tulangan dalam meningkatkan efisiensi waktu pelaksanaannya. Keterlibatan pelaku akan terlihat dari tahap-tahap yang harus dilakukan melalui pendekatan SSM ini yaitu 1) identifikasi permasalahan tidak terstruktur, 2) strukturisasi permasalahan, 3) perumusan root definitions, 4) perumusan model konseptual, 5) perbandingan model konseptual dengan fakta lapangan, 6) penentuan perubahan yang secara sistem diinginkan, dan 7) pelaksanaan langkah tindakan untuk perbaikan. Dengan penerapan Soft System Methodology (SSM) ini, dibentuk pemodelan alur distribusi material baja tulangan yang diharapkan dapat menjadi solusi permasalahan yang ada.
In a construction project, the delay of steel material arrival affects the execution time, therefore, Reinforcing bar material distribution in site become one of the factors which affect the availability of Reinforcing bar material to be worked on. At the North Point Navapark Project, the steel material distribution flow does not yet have time-efficient steps and methods. Soft System Methodology (SSM) is a method to approach, which can be use to create a steel material distribution flow model to increase execution time efficiency. actors involvement will be shown from the steps, which are 1) Problem situation considered problematic, 2) problem structures, 3) Root definition formulation, 4) Conceptual Model formulation, 5) Comparison between conceptual model and reality 6) systematic choices of change and 7) action to improve the problem situation. With the application of the Soft System Methodology (SSM), a model of the distribution flow of steel material is formed which is expected to be a solution for existing problems.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Distribusi Material baja tulangan, Soft System Methodology, waktu pelaksanaan Steel material distribution, Soft System Methodology, Executon time |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 03 Sep 2025 10:43 |
Last Modified: | 03 Sep 2025 10:44 |
URI: | https://repository.itpln.ac.id/id/eprint/503 |