ASHARI, SINATRYA NALADINDA and Pasra, Nurmiati (2019) PENINGKATAN SAVING KWH DENGAN P2TL AKIBAT PELANGGARAN PII DI PT PLN (PERSERO) RAYON DEPOK KOTA. Diploma thesis, ITPLN.
0 COVER.pdf
Download (85kB)
1 LEMBAR PENGESAHAN.pdf
Download (174kB)
LEMBAR PENGESAHAN PROYEK AKHIR.pdf
Download (102kB)
3 BATANG TUBUH.pdf
Restricted to Registered users only
Download (572kB)
4 DAFTAR PUSTAKA.pdf
Download (10kB)
Abstract
Penertiban Pemakaian Tenaga Listrik (P2TL) dilakukan di PT PLN (Persero) Rayon Depok Kota dalam rangka meningkatkan saving energy yang disebabkan oleh penyalahgunaan energi listrik. Dalam pelaksanaannya, banyak pelanggan yang melakukan pelanggaran terhadap ketentuan-ketentuan yang berlaku. Upaya penyalahgunaan energi listrik dilakukan dengan mengubah pengawatan kWh meter sehingga energi listrik yang digunakan tidak terukur sepenuhnya. Akibatnya, banyak energi listrik yang telah disalurkan namun tidak tertagih. Sanksi yang diberikan yaitu denda berupa Tagihan Susulan, dilakukan pemadaman sementara dan penormalan pengawatan kWh meter serta diberikan surat panggilan ke pelanggan untuk menyelesaikan permasalahan penyalahgunaan energi listrik. Pelanggaran yang dilakukan oleh pelanggan dengan daya kontrak 2.200 VA membayar denda sebesar Rp 17.779.912 dengan saving energy 12.117,6 kWh. Sedangkan pelnggan dengan daya kontrak 900 VA membayar denda Rp 6.702.134 dengan besar saving energy 4.957,2 kWh.
Control of Power Consumption (P2TL) conducted at PT PLN (Persero) Rayon Depok Kota in order to increase energy saving caused by misuse of electrical energy. In practice, many customers who violates the provisions in force. Efforts misuse of electrical energy is done by changing the wiring kWh meter so that electric energy used is not fully measurable. As a result, a lot of electrical energy that has been distributed but not collectible. The sanction is a fine form of Supplementary Charges, performed temporary outage and normalization kWh meter wiring and given a summons to customers to solve the problems of the misuse of electrical energy. The violations committed by customers with 2,200 VA power contract to pay a fine of Rp 17.779.912 with energy saving 12.117.6 kWh. While customers with 900 VA power contract to pay a fine of Rp 6,702,134 with a large energy saving 4957.2 kWh.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | P2TL, saving energy, electrical energy abuse P2TL, saving energy, penyalahgunaan energi listrik |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 12 Feb 2026 13:54 |
| Last Modified: | 12 Feb 2026 13:54 |
| URI: | https://repository.itpln.ac.id/id/eprint/5037 |
