Di dalam suatu sistem pembangkit listrik tenaga uap, terdapat sebuah alat yang penting untuk memback up beban – beban penting (essensial) saat terjadi blackout. Alat tersebut adalah Emergency Diesel Generator (EDG), Emergency Diesel Generator (EDG) berfungsi sebagai tenaga cadangan yang berbahan bakar solar. Di PLTU UJP PALABUHANRATU memiliki tiga unit sistem pemasokan listrik dan untuk menjaga kestabilan pemasokan listrik disaat pengoperasian unit maka dari itu disetiap unit nya mempunyai satu Emergency Diesel Generator (EDG). Cara kerjanya menggunakan metode start otomatis dan manual, start otomatis dilakukan dari Central Control Room (CCR) sedangkan start manual dilakukan di ruang unit Emergency Diesel Generator (EDG). Untuk menjaga agar kapasitas Emergency Diesel Generator (EDG) tidak overload jika terjadi blackout atau gangguan diutamakan lah beban – beban penting (essensial). Beban – beban penting (essensial) tersebut dibagi menjadi 2 board yaitu board A dan board B yang dimana mempunyai beban dengan tegangan 400V dan 230V, beberapa diantaranya beban – beban penting (essensial) yang diprioritaskan itu adalah Steam Turbine Jacking Oil Pump Motor, Generator Air Side Seal Oil Pump Motor, Generator Hydrogen Side Seal Oil Pump Motor, dll. Maka dengan adanya studi penggunaan serta pemeliharaan yang tepat pada Emergency Diesel Generator (EDG) akan siap beroperasi tanpa takut terjadi overload disaat blackout.
In a system of steam power plants, there is an important tool for backing up the load - essential loads (essential) during a blackout. The tool is the Emergency Diesel Generator (EDG), Emergency Diesel Generator (EDG) which serves as a backup power diesel. UJP Palabuhanratu in the power plant has three units of electricity supply systems and to maintain a stable supply of electricity when operating the unit and therefore its units each have an Emergency Diesel Generator (EDG). How it works using automatic and manual start, automatic start carried from the Central Control Room (CCR), while the manual start is performed in a unit of Emergency Diesel Generator (EDG). To keep the capacity of the Emergency Diesel Generator (EDG) is not overloaded in the event of a blackout or interruption priority was load - essential loads (essential). Expenses - essential loads (essential) is divided into two boards, namely board A and board B, which had a load with a voltage of 400V and 230V, some load - essential loads (essential) with priority it is a Steam Turbine Jacking Oil Pump Motor, Generator Water Side Seal Oil Pump Motor, Generator Hydrogen Side Seal Oil Pump Motor, etc. So with the study of the proper use and maintenance of the Emergency Diesel Generator (EDG) will be ready to operate without fear of overload when blackout. Expenses - essential loads (essential) is divided into two boards, namely board A and board B, which had a load with a voltage of 400V and 230V, some load - essential loads (essential) with priority it is a Steam Turbine Jacking Oil Pump Motor, Generator Water Side Seal Oil Pump Motor, Generator Hydrogen Side Seal Oil Pump Motor, etc. So with the study of the proper use and maintenance of the Emergency Diesel Generator (EDG) will be ready to operate without fear of overload when blackout. Expenses - essential loads (essential) is divided into two boards, namely board A and board B, which had a load with a voltage of 400V and 230V, some load - essential loads (essential) with priority it is a Steam Turbine Jacking Oil Pump Motor, Generator Water Side Seal Oil Pump Motor, Generator Hydrogen Side Seal Oil Pump Motor, etc. So with the study of the proper use and maintenance of the Emergency Diesel Generator (EDG) will be ready to operate without fear of overload when blackout.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Emergency,Diesel, Essential, Central Control Room, Blackout. Emergency, Diesel, Essensial, Central Control Room, Blackout. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 13 Feb 2026 03:52 |
| Last Modified: | 13 Feb 2026 03:52 |
| URI: | https://repository.itpln.ac.id/id/eprint/5039 |