OPTIMALISASI PEMBEBANAN TRANSFORMATOR DISTRIBUSI 20KV DI GARDU WNA004 DARI PENYULANG RATU GARDU INDUK CIKUPA DI PT. PLN (PERSERO) AREA CIKUPA

SETYO, ANDRIYANTO NUR and Paryoto, Djoko (2016) OPTIMALISASI PEMBEBANAN TRANSFORMATOR DISTRIBUSI 20KV DI GARDU WNA004 DARI PENYULANG RATU GARDU INDUK CIKUPA DI PT. PLN (PERSERO) AREA CIKUPA. Diploma thesis, ITPLN.

[thumbnail of 1 COVER (008).pdf] Text
1 COVER (008).pdf

Download (63kB)
[thumbnail of pengesahan baru.pdf] Text
pengesahan baru.pdf

Download (133kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (53kB)
[thumbnail of BAB 2.pdf] Text
BAB 2.pdf

Download (318kB)
[thumbnail of BAB 3.pdf] Text
BAB 3.pdf
Restricted to Registered users only

Download (172kB)
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (662kB)

Abstract

Optimalisasi pembebanan transformator distribusi 3 fasa dengan melaksanakan penyeimbangan beban pada dasarnya adalah akan memberikan beban pada transformator tersebut yang sesuai dengan kapasitas Transformator serta memberikan beban yang diperbolehkan sesuai dengan SPLN. Sehingga kemampuan atau batasan-batasan yang di alirkan pada beban dapat optimal. Penyeimbangan beban pada transformator distribusi yang terletak di Desa Wanakerta yang sebelumnya dilakukan pengukuran beban saat beban puncak dan juga di siang hari waktu di luar beban puncak. Data-data hasil pengukuran dianalisis dan selanjutnya dilakukan optimalisasi pembebanan transformator dan setelah penyeimbangan beban diukur kembali untuk dianalisis Total kehilangan energi sebelum penyeimbangan beban adalah sebesar 13.310,52 kWh/bulan, setelah penyeimbangan beban adalah sebesar 1033,56 kWh/bulan. Dapat menekan kehilangan energi sebesar 12.276,96 kWh/bulan atau PLN dapat menekan kerugian sebesar Rp. 12.235.967,00- /bulan pada gardu WNA004.

Optimization of 3-phase distribution transformer loading to implement load balancing is basically a load on the transformer will provide the appropriate transformer capacity and provide load permitted in accordance with SPLN. So the capability or limitations that circulate in the load can be optimized. Balancing the load on distribution transformers located on Wanakerta vilage previously measured during peak loads during the day time and also beyond the peak load. The data were analyzed and the results of the measurement is then performed after optimization of load transformer and load balancing are measured again to be analyzed. The total energy loss before balancing the load is equal to 13.310,52 kWh per month, after balancing the load is equal to 1033,56 kWh per month. Can suppress the energy loss by 12.276,96 kWh per month or PLN can reduce losses of Rp. 12.235.967,00- each month at distribution substations WNA004.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: distribution , Load balancing, Optimzed distribusi, penyeimbangan beban, optimalisasi
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 13 Feb 2026 10:42
Last Modified: 13 Feb 2026 10:42
URI: https://repository.itpln.ac.id/id/eprint/5068

Actions (login required)

View Item
View Item