PRASOJO, ABBIYOGA and Ispranyoto, Edy (2018) REKONFIGURASI JARINGAN SKTM DALAM UPAYA MENEKAN SUSUT TEKNIK PENYULANG DI PT.PLN (PERSERO) AREA CIMAHI. Diploma thesis, ITPLN.
cover.pdf
Download (277kB)
Lembar Pengesahan.pdf
Download (364kB)
Abstak.pdf
Download (181kB)
Abstract.pdf
Download (180kB)
BAB I.pdf
Download (149kB)
BAB II.pdf
Download (396kB)
BAB III.pdf
Restricted to Registered users only
Download (179kB)
BAB IV.pdf
Restricted to Registered users only
Download (717kB)
BAB V.pdf
Restricted to Registered users only
Download (113kB)
Daftar Pustaka Tugas Akhir.pdf
Download (247kB)
Abstract
Kondisi pembebanan penyulang PCB dari Gardu Induk Lagadar Area Cimahi telah mengalami overload, disisi lain penampang konduktor yang digunakan masih berukuran 150 mm2.. Dengan kondisi pembebanan yang cukup tinggi, maka dapat mengakibatkan losses di sisi teknik serta akan memengaruhi keandalan sistem dan kontinuitas penyaluran. Upaya yang dilakukan untuk mengurangi losses sebagai pengaruh dari kondisi pembebanan adalah dengan melakukan rekonfigurasi jaringan pada Penyulang PCB ke Penyulang PCS. Rekonfigurasi jaringan pada penyulang PCB yang kondisi pembebanannya telah Overload terhadap kemampuan hantar arus konduktornya dilakukan dengan memindahkan sebagian beban ke Penyulang PCS yang kondisi pembebananya masih Underload terhadap kemampuan hantar arus konduktornya. Sehingga hasil simulasi dapat dijadikan rekomendasi untuk melaksanakan rekonfigurasi jaringan pada SKTM 20 kV secara efektif, efisien, dapat memberikan pengaruh yang signifikan terhadap penurunan losses serta dapat meningkatkan keandalan jaringan.
Loading condition of feeder PCB which supplied from Lagadar substation of Area Cimahi has been overloaded, on the other side, diameter of conductor used on feeder is still 150 mm2 which technically considered unballance to its loading condition. Hence, overloaded condition and small diameter of conductor can pottentially occurs technical losses on PCB feeder and will affect on network reliability as well. To mitigate certain condition, loading on PCB feeder need to be decreased by reconfiguring its load to PCS feeder. Feeder reconfiguration on PCB feeder will be done by transferring some of its load to PCS feeder which loading condition is still underload. The load flow simulation will be a refference to execute reconfiguration on PCB-PCS feeder of area Cimahi 20 kV spindle network. Purpose of this network reconfiguration are to signifficantly lessen technical losses on PCB feeder which will imply to reliability and continuity of electrical supply on network system.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Reconfiguration, Energy not Sold (kWh), technical losses. Rekonfigurasi, Energi listrik (kWH) yang tidak terjual, losses. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 19 Feb 2026 05:35 |
| Last Modified: | 19 Feb 2026 05:35 |
| URI: | https://repository.itpln.ac.id/id/eprint/5112 |
