PENGARUH PENGGANTIAN SUTM PADA SEGMEN KDR 180 KE BC 279 MENJADI SKTM SEGMEN BC 13C KE BC 279 PADA PENYULANG SUSU DI PT PLN (PERSERO) AREA CENGKARENG

RAHMASARI, ADISSA and Diantari, Retno Aita (2018) PENGARUH PENGGANTIAN SUTM PADA SEGMEN KDR 180 KE BC 279 MENJADI SKTM SEGMEN BC 13C KE BC 279 PADA PENYULANG SUSU DI PT PLN (PERSERO) AREA CENGKARENG. Diploma thesis, ITPLN.

[thumbnail of 1. COVER.pdf] Text
1. COVER.pdf

Download (406kB)
[thumbnail of 2. LEMBAR PENGESAHAN TIM PENGUJI.pdf] Text
2. LEMBAR PENGESAHAN TIM PENGUJI.pdf

Download (189kB)
[thumbnail of 3. BAB I II III IV V.pdf] Text
3. BAB I II III IV V.pdf
Restricted to Registered users only

Download (890kB)
[thumbnail of 4. DAFTAR PUSTAKA.pdf] Text
4. DAFTAR PUSTAKA.pdf

Download (83kB)

Abstract

Jaringan Tegangan Menengah (JTM) berfungsi untuk menyalurkan tenaga listrik dari gardu induk ke gardu distribusi. Tegangan pengenal yang digunakan oleh PT PLN adalah 20 kV. Konstruksi JTM terbagi dua yaitu, Saluran Udara Tegangan Menengah (SUTM) dan Saluran Kabel Tanah Tegangan Menengah (SKTM). Adapun berbagai faktor yang dapat mempengaruhi penyaluran tenaga listrik seperti pembangunan infrastruktur yang dapat mengganggu Saluran Udara Tegangan Menengah (SUTM). Karena itu, dilakukan pengamanan jaringan berupa penggantian saluran yang awalnya udara menjadi saluran kabel tanah pada segmen KDR 180 ke BC 279. Dari dampak penggantian tersebut dilakukan perbandingan antara sebelum dan sesudah diganti dilihat dari susut energi dan susut tegangannnya. Susut energi dan susut tegangan setelah diganti lebih besar daripada sebelum (sekitar 0,3 % kenaikan susut energi) dan (sekitar 0,01 % kenaikan susut tegangan).

The Medium Voltage Network (JTM) functions to distribute electricity from the substation to the distribution substation. The rated voltage used by PT PLN is 20 kV. JTM construction is divided into two, namely Medium Voltage Overhead Line (SUTM) and Medium Voltage Ground Cable Line (SKTM). As for various factors that can affect the distribution of electricity such as the construction of infrastructure that can interfere with the Medium Voltage Overhead (SUTM). Therefore, network security is carried out in the form of line replacement which is initially air into a ground cable line in the segment of KDR180 to BC 279. From the impact of the replacement, a comparison is made between before and after being replaced seen from the energy loss and the voltage loss. Energy losses and voltage losses after being replaced are greater than before (about 0.3% increase in energy losses) and (about 0.01% increase in voltage losses).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Changing, SUTM, SKTM, Losses Peggantian, SUTM, SKTM, susut
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 19 Feb 2026 06:07
Last Modified: 19 Feb 2026 06:07
URI: https://repository.itpln.ac.id/id/eprint/5117

Actions (login required)

View Item
View Item