ANALISA BIAYA DAN WAKTU DENGAN METODE 3 SHIFT (STUDI KASUS: PROYEK GEDUNG KOPERASI DAN UKM KOTA TANGERANG SELATAN)

Purba, Rizki Arista and Sepriyanna, Irma (2021) ANALISA BIAYA DAN WAKTU DENGAN METODE 3 SHIFT (STUDI KASUS: PROYEK GEDUNG KOPERASI DAN UKM KOTA TANGERANG SELATAN). Diploma thesis, ITPLN.

[thumbnail of Rizki A Purba_2014-21-120.pdf] Text
Rizki A Purba_2014-21-120.pdf
Restricted to Repository staff only

Download (14MB)

Abstract

Proyek pengerjaan gedung koperasi dan UKM Kota Tanggerang Selatan direncanakan akan selesai dalam kurun waktu 539 yang dimulai pada 22 Januari 2018 sampai 14 Juli 2019. Berdasarkan laporan realisasi pada minggu ke 21 nilai deviasi pekerjaan fisik mingguan adalah -0,371. Untuk mempercepat pengerjaan proyek maka perlu dilakukan percepatan dengan analisis metode Time Cost Trade Off. Percepatan dilakukan dengan menambah shift kerja sebanyak 3x shift kerja dengan durasi 8 jam/shift. Dilakukan kompresi jalur kritis dari network diagram menggunakan Microsoft project guna mencari durasi optimum. Dari hasil penelitian diperoleh durasi optimum selama 77 hari dalam pekerjaan arsitektur dengan biaya total sebesar Rp70.216.520.665,27 dibandingkan durasi normal selama 539 hari dengan biaya total Rp 70.150.237.470,84. Hal ini menunjukkan pengerjaan proyek dapat dipercepat selama 63 hari dengan tambahan biaya sebesar Rp 66.283.194,43

The construction project for the cooperative building and UKM South Tanggerang City is planned to be completed within a period of 539 starting on January 22 2018 to July 14 2019. Based on the realization report in week 21 the deviation value of weekly physical work is -0.371. To speed up the project work, it is necessary to accelerate the analysis of the Time Cost Trade Off method. Acceleration is done by adding work shifts of 3 times with a duration of 8 hours / shift. Critical path compression is performed from the network diagram using Microsoft project to find the optimum duration. From the research results obtained the optimum duration for 77 days in architecture with a total cost of Rp70.216.520.665,27 50 compared to the normal duration of 539 days with a total cost of Rp. 70,150,237,470.84. This shows that project work can be accelerated for 63 days with an additional cost of Rp 66.283.194,43

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analisis Time Cost Trade Off, Biaya, Percepatan , Durasi, Jalur Kritis Time Cost Trade Off Analysis, Cost, Acceleration, Duration, Critical Path
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 04 Sep 2025 10:32
Last Modified: 04 Sep 2025 10:32
URI: https://repository.itpln.ac.id/id/eprint/512