AULLHIA, INTAN RIZKI and suwarno, suwarno (2018) PENERAPAN OVER LOAD SHEDDING PADA INTERBUS TRANSFORMER 500/150 kV 1,2 GANDUL. Diploma thesis, ITPLN.
1. Cover.pdf
Download (217kB)
2. Lembar Pengesahan Pembimbing.pdf
Download (55kB)
7. Abstrak.pdf
Download (6kB)
8. Abstract.pdf
Download (7kB)
10. Bab I - V.pdf
Restricted to Registered users only
Download (965kB)
11. Daftar pustaka.pdf
Download (61kB)
Abstract
Interbus transformer (IBT) sebagai unsur utama dalam sistem penyaluran dan distribusi tenaga listrik. Penyaluran daya dapat terhambat akibat adanya gangguan yang mengakibatkan kerusakan dan berkurangnya lifetime pada peralatan. Demi keandalan sistem, pembebanan IBT tidak boleh melebihi 60%. Hal ini untuk mengantisipasi kriteria N-1 dan juga setting OLS bekerja pada 110%.Gangguan yang sering terjadi pada IBT yaitu gangguan beban lebih, yang dapat terjadi karena berbagai hal diantaranya kriteria N-1 maupun daya pakai konsumen yang fluktuatif. Kondisi ini dapat diatasi dengan penerapan strategi pelepasan beban secara otomatis (Overload Shedding). Overload Shedding merupakan suatu bentuk tindakan pelepasan beban lebih yang terjadi secara otomatis ataupun manual yang terpasang pada saluran transmisi sebagai pengaman agar terhindar atau mencegah terjadinya pemadaman yang meluas. Proyek akhir ini membahas penerapan OLS pada IBT 1,2 Gandul dengan menghitung arus seting, serta target pelepasan beban sehingga dapat diketahui hasil penyaluran ketika dipasang OLS dan tidak.
Inter bus transformer (IBT) as the main element in power distribution and distribution system. Power distribution may be hampered due to interference resulting in damage and reduced lifetime on equipment. For the sake of system reliability, IBT charges may not exceed 60%. This is to anticipate the N-1 criteria and also the OLS setting works at 110%. The disruption that often occurs in IBT is more load burden, which can occur due to various things such as N-1 criteria and consumer's fluctuating power. This condition can be overcome by the implementation of an automatic load release strategy (Overload Shedding). Overload Shedding is a form of overloading action that occurs automatically or manually installed on the transmission line as a safety to avoid or prevent the occurrence of a widespread blackout. This final project discusses the application of OLS to IBT 1.2 Gandul by calculating the tuning current, as well as the load release target so it can know the distribution result when OLS is installed and not.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | IBT, Overload, Settings Current. IBT, Beban lebih, Arus seting. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 19 Feb 2026 07:43 |
| Last Modified: | 19 Feb 2026 07:43 |
| URI: | https://repository.itpln.ac.id/id/eprint/5137 |