Kebutuhan listrik masyarakat semakin besar. Dengan perkembangan pengguna listrik yang semakin pesat tersebut, pelanggan daripada PT. PLN (PERSERO) tersebut semakin bertambah. Dengan semakin bertambahnya pelanggan, kualitas dari pasokan listrik pada saluran distribusi tersebut harus semakin baik. Jika terjadi gangguan pastilah akan sangat mengganggu aktifitas harian masyarakat ataupun industri. Maka dari itu sistem proteksi haruslah dipasang pada beberapa gardu distribusi untuk melokalisasi trip agar tidak memadamkan keseluruhan penyulang. Salah satu alat proteksi adalah relai arus lebih. Relai arus lebih yang biasanya digunakan adalah relai inverse. Nilai seting relai arus lebih yang dapat dipasang pada gardu induk adalah di arus setting primernya 308 A, TMSnya 0,12 dan waktunya adalah 0,3 detik. Nilai seting relai arus lebih yang dapat dipasang pada gardu distribusi adalah di arus setting primernya 308 A, TMSnya 0,045 dan waktunya adalah 0,1 detik. Koordinasinya terlihat bahwa nilai waktu kerja dari relai arus lebih pada gardu distribusi lebih cepat dari pada nilai waktu pada relai arus lebih pada gardu induk. Hal ini agar relai pada gardu distribusi bekerja lebih dahulu sebelum gardu induk, yang mana dapat melokalisasi area pemadaman pada penyulang tersebut.
The electricity needs of the community are getting bigger. With the rapid development of electricity users, customers than PT. PLN (PERSERO) is increasing. With the increasing number of customers, the quality of the electricity supply in the distribution channel must be better. If an interruption occurs, it will definitely disrupt the daily activities of the community or industry. Therefore the protection system must be installed in several distribution substations to localize the trip so as not to extinguish the whole feeder. One protection tool is overcurrent relays. The over current relays that are usually used are inverse relays. The over current relay setting value that can be installed at the substation is at the primary setting current 308 A, the TMS is 0.12 and the time is 0.3 seconds. The over current relay setting value that can be installed in the distribution substation is at the primary setting current 308 A, the TMS is 0.045 and the time is 0.1 seconds. The coordination shows that the working time value of the over current relay in the distribution substation is faster than the time value of the over current relay at the substation. This is so that the relay at the distribution substation works before the substation, which can localize the outage area to the feeder.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | localization of disturbance, feeder, over current relay lokalisasi gangguan, penyulang, relai arus lebih |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 19 Feb 2026 08:10 |
| Last Modified: | 19 Feb 2026 08:10 |
| URI: | https://repository.itpln.ac.id/id/eprint/5144 |