KOORDINASI KERJA RELE ARUS LEBIH DAN RELE GANGGUAN TANAH PADA PENYULANG HIMALAYA DI GARDU INDUK CENGKARENG

NUGRAHA, GILANG RIZKY and Ispranyoto, Edy (2018) KOORDINASI KERJA RELE ARUS LEBIH DAN RELE GANGGUAN TANAH PADA PENYULANG HIMALAYA DI GARDU INDUK CENGKARENG. Diploma thesis, ITPLN.

[thumbnail of Cover Proposal.pdf] Text
Cover Proposal.pdf

Download (101kB)
[thumbnail of Lampiran Asli.pdf] Text
Lampiran Asli.pdf

Download (1MB)
[thumbnail of ABSTRAK.pdf] Text
ABSTRAK.pdf

Download (119kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (13kB)
[thumbnail of BAB II.pdf] Text
BAB II.pdf

Download (560kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (459kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (501kB)
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (83kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (137kB)

Abstract

Pada jaringan distribusi tegangan menengah merupakan salah satu sistem tenaga listrik yang tidak dapat terhindar dari gangguan. Hal ini dapat menyebabkan kerusakan pada peralatan listrik sehingga terganggunya kontinyuitas suatu sistem distribusi. Untuk mengatasi hal ini, dibutuhkan sistem proteksi yang efektif. Berdasarkan analisis trip PMT dan perhitungan setting arus dan waktu di penyulang Himalaya, Nilai setting arus dan waktu Rele Arus Lebih yang didapat adalah 314,6 A dan TMS 0,15 dengan setting arus Rele Gangguan Tanah 84,451 A dan TMS 0,10 pada sisi Outgoing penyulang. Nilai setting arus dan waktu Rele Arus Lebih yang didapat adalah 1544,4 A dan TMS 0,20 dengan setting arus arus Rele Gangguan Tanah 84,451 A dan TMS 0,24 pada sisi Incoming penyulang. Diharapkan setelah dilakukan setting tersebut rele dapat bekerja optimal pada penyulang tersebut.

On medium voltage distribution network is one of the power system that cannot be spared from distractions. This can cause damage to the electrical equipment so that disruption of the continued of a distribution system. To overcome this, It takes an effective protection system. An effective protection system has some terms that is fast, selective and reliable so as to reduce the impact of the disruptions that have occurred. Based on the analysis and calculation of the PMT trip current setting and time in Himalaya’s feeder, the current setting Value and the time gained Over Current Relay was 314,6 A and TMS 0.15 with the current setting of the Ground Fault Relay 84.451 A and TMS 0.10 on the Outgoing side of the feeder. The current setting value and time Over Current Relay obtained is A 1544,4 A and TMS 0.20 with a setting the flow the flow of Ground Fault Relay 84.451 A and TMS 0.24 on the Incoming side of the feeder. So expect performance relay optimally working on feeder.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Protection Relay, Fault Current, Disconnecting Switch, Incoming, Outgoing Rele, Arus Gangguan, PMT, Incoming, Outgoing
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 20 Feb 2026 01:58
Last Modified: 20 Feb 2026 01:58
URI: https://repository.itpln.ac.id/id/eprint/5158

Actions (login required)

View Item
View Item