Maghrisa, Muhammad Dhiya Ulhaq and Hidayawanti, Ranti (2021) ANALISA WHAT IF SEBAGAI METODE UNTUK ANTISIPASI KETERLAMBATAN DURASI PROYEK ( Studi Kasus Proyek Pembangunan Gedung DPRD Kabupaten Pemalang ). Diploma thesis, ITPLN.
![[thumbnail of Muhammad Dhiya Ulhaq Maghrisa_201621084.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
Muhammad Dhiya Ulhaq Maghrisa_201621084.pdf
Restricted to Repository staff only
Download (2MB)
Abstract
Keterlambatan proyek merupakan masalah yang sering terjadi pada setiap proyek yang berlangsung. Pada proyek pembangunan Gedung DPRD Kabupaten Pemalang ini mengalami keterlambatan pada beberapa aktivitas pekerjaan. Pada penelitian ini penulis bertujuan untuk menganalisa tentang Keterlambatan yang terjadi dengan metode analisa WHAT IF. Dengan mencari CPM yang didapat melalui hasil penjadwalan dengan MOP(Microsoft Office Project) Hasil yang didapat pada dengan analisa WHAT IF untuk asumsi 10% total waktu lembur 11,9jam dengan biaya Rp. 317.609.141 dan untuk total pekerja adalah 11 pekerja dengan total biaya Rp. 126.240.625. Untuk asumsi 20 % diapatkan total lembur dan total biaya adalah 17,7 jam dengan total biaya Rp 453.659.792 dan untuk total pekerja adalah 26 orang dengan total biaya Rp. 252.481.250. Untuk asumsi 30% didapatkan total untuk waktu lembur adalah 30,3 jam dengan total biaya Rp 719.814.193 dan total untuk pekerja adalah 31 orang dengan total biaya Rp. 378.721.875
Project delays are a problem that often occurs in every ongoing project. The construction project of the Pemalang Regency DPRD Building experienced delays in several work activities. In this study the author aims to analyze the delays that occur with the WHAT IF analysis method. By looking for the CPM obtained through the results of scheduling with MOP (Microsoft Office Project) The results obtained with the WHAT IF analysis for the assumption of 10% of the total overtime time is 11.9 hours at a cost of Rp. 317,609,141 and for a total of 11 workers with a total cost of Rp. 126,240,625. For the assumption of 20%, the total overtime and total costs are 17.7 hours with a total cost of IDR 453,659,792 and for a total of 26 workers with a total cost of IDR. 252,481,250. For the 30% assumption, the total overtime time is 30.3 hours with a total cost of Rp. 719,814,193 and the total for workers is 31 people with a total cost of Rp. 378,721,875
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Keterlambatan, WHAT IF, CPM, MOP Delay, WHAT IF, CPM, MOP |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 04 Sep 2025 11:09 |
Last Modified: | 04 Sep 2025 11:09 |
URI: | https://repository.itpln.ac.id/id/eprint/521 |