JAYA, EKA RACHMAN and Pahiyanti, Novi Gusti (2018) PERCEPATAN RECOVERY TIME GANGGUAN TRAFO PADA GARDU TIPE PORTAL DENGAN MENGGUNAKAN UNIT TRAFO BERGERAK DI AREA BINTARO. Diploma thesis, ITPLN.
COVER.pdf
Download (369kB)
Lembar Pengesahan.pdf
Download (71kB)
Abstrak.pdf
Download (233kB)
abstrac.pdf
Download (232kB)
BAB I Acak.pdf
Download (163kB)
BAB II UTB.pdf
Download (475kB)
BAB III Acak.pdf
Restricted to Registered users only
Download (314kB)
BAB IV Acak.pdf
Restricted to Registered users only
Download (228kB)
BAB V acak.pdf
Restricted to Registered users only
Download (252kB)
Daftar Pustaka.pdf
Download (143kB)
Abstract
Kebutuhan akan energi listrik meningkat seiring dengan pesatnya kemajuan teknologi, listrik telah digunakan untuk berbagai keperluan rumah tangga sampai ke dunia industri. Untuk itu suatu sistem kelistrikan yang handal mutlak diperlukan. Sistem kelistrikan tidak luput dari gangguan, mulai dari proses pembangkitan sampai pada proses pemakainya. Dan berbagai cara dilakukan untuk mengatasi gangguan tersebut. Gangguan-gangguan yang terjadi akan berdampak langsung pada beban (pelanggan). Jika terjadi gangguan, maka penyaluran listrik ke pelanggan juga akan terputus. Maka untuk mengurangi pemadaman ke konsumen, maka pihak pengeloalah membuat instalasi cadangan yaitu Unit Trafo Bergerak (UTB) yang diperlukan agar recovery time cepat dan tepat. Dalam pembahasan proyek akhir ini, yg dibahas adalah Perbandingan indeks keandalan dampak dari pemakaian UTB terhadap recovery time.
Demand for electricity increased with the rapid advances in technology, the electricity has been used for various household purposes to the industrial world. For that a reliable electrical system is absolutely necessary. The electrical system does not escape from the disorder, ranging from the generation process until the process of the wearer. And in many ways done to overcome these disorders. Disturbances that occur will impact directly on the load (the customer). If interference occurs, then the distribution of electricity to customers will also be disconnected. So to reduce the blackout to the consumer, distribution network facilities which include Moving Transformer Unit absolute need to recovery time. In the discussion of this final project, which is discussed is rasio the reliabilty index of the usage Moving Transformer Unit to recovery time
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Recovery Time, SAIDI, SAIFI, Moving Transformer Unit Recovery time, SAIDI, SAIFI, Unit Trafo Bergerak (UTB). |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 24 Feb 2026 02:49 |
| Last Modified: | 24 Feb 2026 02:49 |
| URI: | https://repository.itpln.ac.id/id/eprint/5213 |
