ANALISA PRODUKTIVITAS TENAGA KERJA DAN DURASI PADA PEKERJAAN LANTAI DI LANTAI 1 DAN PEKERJAAN PASANGAN BATA LANTAI 2 DIBANDINGKAN RENCANA KERJA ( Studi Kasus Proyek Pembangunan Laboratorium Pendidikan Guru Sekolah Dasar Universitas Samudra Kota Langsa )

Syukri, Reza Maulana and Siswomartono, Hastanto (2021) ANALISA PRODUKTIVITAS TENAGA KERJA DAN DURASI PADA PEKERJAAN LANTAI DI LANTAI 1 DAN PEKERJAAN PASANGAN BATA LANTAI 2 DIBANDINGKAN RENCANA KERJA ( Studi Kasus Proyek Pembangunan Laboratorium Pendidikan Guru Sekolah Dasar Universitas Samudra Kota Langsa ). Diploma thesis, ITPLN.

[thumbnail of Reza Maulana Syukri_201621100.pdf] Text
Reza Maulana Syukri_201621100.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Pelaksanaan Proyek Pembangunan Gedung Laboratorium Pendidikan Guru Sekolah Dasar tidak mungkin dapat diselesaikan tanpa adanya campur tangan tenaga kerja dilapangan, khususnya pada pekerjaan lantai dan pasangan bata. Pada Proyek Pembangunan Gedung Laboratorium Pendidikan Guru Sekolah Dasar tenaga kerja sangat besar pengaruhnya terhadap prestasi maupun keterlambatan proyek. Jadi alangkah baiknya jika mengetahui produktivitas tenaga kerja pada masing - masing item pekerjaan khususnya pada pekerjaan lantai dan pasangan bata. Pada penelitian ini penulis ingin menganalisa tentang produktivitas tenaga kerja untuk pekerjaan lantai di lantai 1 dan pasangan bata dilantai 2 dilapangan setelah itu dibandingkan dengan perencanaan proyek. Adapun tujuan dari peneletian ini sendiri yaitu mencari produktivitas dan durasi dari pekerjaan lantai dilantai 1 dan pekerjaan pasangan bata dilantai 2. Metode pengumpulan data yang digunakan dalam penelitian ini adalah observasi , wawancara , dan studi literatur. Dari hasil penelitian untuk menganalisa produktivitas tenaga kerja pada pekerjaan lantai di lantai 1 dan pasangan bata di lantai 2 adalah hanya ada 2 item pekerjaan yang terlambat diselesaikan jika dibandingkan dengan perencanaan yaitu item pasangan ½ bata 1Pc:4Pp yang mengalami keterlambatan sebanyak 6 hari untuk pekerjaan pasangan di lantai 2 dan item pekerjaan pasir urug yang mengalami keterlambatan 1 hari untuk pekerjaan lantai 1. Untuk item pekerjaan lainnnya selesai tepat waktu bahkan mayoritas selesai lebih cepat dari perencanaan. Untuk jumlah tenaga kerja yang bekerja dilapangan lebih sedikit jika dibandingkan dengan jumlah tenaga rencana akan tetapi tenaga kerja dilapangan produktivitasnya lebih baik dibandingkan dengan produktivitas tenaga kerja dari perencanaan.

The implementation of the Construction Project of the Primary School Teacher Education Laboratory Building could not have been completed without the intervention of manpower in the field, especially in floor work and brick couples. In the Construction Project Laboratory Building Primary School Teachers labor is very much influence on the achievement and delay of the project. So it would be nice to know the productivity of labor on each of the work items, especially on floor work and brick pairs. In this study the authors wanted to analyze about labor productivity for floor work on the 1st floor and brick pairs on the 2nd floor in the field after that compared to project planning. The purpose of this study itself is to find the productivity and duration of the floor work on the 1st floor and the work of brick couples on the 2nd floor. The data collection methods used in this study are observations, interviews, and literature studies. From the results of the study to analyze labor productivity on floor work on the 1st floor and brick pairs on the 2nd floor there are only 2 items of work that are late to be completed when compared to planning i.e. 1/2 brick couple items 1Pc:4Pp which experienced delays of 6 days for couples' work on the 2nd floor and sand work items that experienced a 1 day delay for 1st floor work. For other work items, it is completed on time and even the majority are completed faster than planning. For the number of workers who work in the field is less when compared to the number of workers plan but the workforce in the field of productivity is better than the productivity of the workforce from planning.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Produktivitas, Tenaga Kerja, Rencana Kerja Productivity, Labor, Work Plan
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 04 Sep 2025 13:04
Last Modified: 04 Sep 2025 13:04
URI: https://repository.itpln.ac.id/id/eprint/527

Actions (login required)

View Item
View Item