Vikoreza, Hasri and Assagaf, Aminullah and Ibrahim, Ali Herman (2025) Kajian Kelayakan Teknis Pembangunan Pembangkit Listrik Tenaga Surya Pada Area Gardu Induk Muara Rupit Sumatera Selatan. Masters thesis, IT PLN.
TESIS_202310529_HASRI VIKOREZA.pdf
Restricted to Registered users only
Download (14MB)
Abstract
This study aims to evaluate the technical specifications and maximum capacity of an on-grid Solar Power Plant (PLTS) system at the 150 kV Muara Rupit Substation in South Sumatra. The research employs a technical feasibility study approach using PVsyst version 8.0.6, simulating three PLTS scenarios based on Longi LR5-72HTH-595M modules rated at 595 Wp. Each scenario varies by inverter type, namely a 2200 kWac central inverter, 11 units of 172 kWac string inverters, and 18 units of 100 kWac string inverters. All configurations are designed to optimize the use of 9,881 m² of effective land area. Simulation results show that the maximum installable capacity is 2,276 kWp using 3,825 solar modules. The configuration with 172 kWac string inverters yielded the best performance, with a performance ratio of 86.21% and annual energy output of 3,535.6 MWh. This study concludes that inverter configuration plays a significant role in system efficiency and should be a key consideration in medium-scale PLTS design.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | inverter, technical feasibility study, system configuration, on-grid PLTS, PVsyst |
| Subjects: | Bidang Keilmuan > Teknik Elektro Thesis |
| Divisions: | Pasca Sarjana > S2 Teknik Elektro |
| Depositing User: | Sutrisno |
| Date Deposited: | 26 Feb 2026 06:49 |
| Last Modified: | 26 Feb 2026 06:49 |
| URI: | https://repository.itpln.ac.id/id/eprint/5294 |