ANALISIS PERBANDINGAN PERSYARATAN UMUM KONTRAK PEKERJAAN PEMBANGUNAN GEDUNG WORKING ROOM DATA CENTER SERPONG DENGAN PERSYARATAN UMUM FIDIC

Absani, Hemas Rindhayu and Siswoyo, Sriyono D (2019) ANALISIS PERBANDINGAN PERSYARATAN UMUM KONTRAK PEKERJAAN PEMBANGUNAN GEDUNG WORKING ROOM DATA CENTER SERPONG DENGAN PERSYARATAN UMUM FIDIC. Diploma thesis, ITPLN.

[thumbnail of HEMAS RINDHAYU ABSANI.pdf] Text
HEMAS RINDHAYU ABSANI.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Suatu kontrak konstruksi adalah sebuah ikatan antara pengguna jasa dengan penyedia jasa. Standar kontrak Internasional mulai banyak digunakan pada proyek pembangunan berskala besar di Indonesia namun, masih banyak pula proyek pembangunan berskala kecil hingga menengah yang menggunakan sistem standar kontrak nasional. Pada penelitian ini penulis melakukan Analisa Perbandingan Persyaratan Umum Kontrak Pekerjaan Pembangunan Gedung Working Room Data Center Serpong Dengan Persyaratan Umum FIDIC. Dokumen kontrak yang digunakan adalah dokumen kontrak pada proyek Pekerjaan Jasa Konstruksi Terintegrasai Rancang Dan Bangun Gedung Working Room Data Center Serpong yang bersifat nasional dan dibandingkan dengan Persyaratan Umum Kontrak FIDIC Proyek EPC/Turnkey (silver book). Masing masing persyaratan umum kontrak kemudian dianalisis perbandingannya dan mendapatkan persentase persyaratan umum kontrak FIDIC yang terdapat pada dokumen kontrak sebesar 34,9% (dengan 58 ayat) sedangkan persyaratan umum kontrak FIDIC yang tidak terdapat dalam dokumen kontrak sebesar 65,1% (dengan 108 ayat).

A construction contract is a bond between service users and service providers. International contract standards are widely used in large-scale development projects in Indonesia, however, there are still many small to medium-scale development projects that use national contract standard system. In this study the authors conducted a Comparative Analysis of the General Requirements of Integrated Construction Services Work Contracts to Design and Build a Serpong Working Room Data Center Building with FIDIC General Requirements. The contract document used is contract document in the Integrated Design and Build Construction Services Works project at the Serpong Data Center Working Room which is national in nature and compared to the FIDIC General Contract Requirements for the EPC / Turnkey Project (silver book). Each general contract requirement was then analyzed for comparison and obtained the percentage of FIDIC contract general requirements contained in the contract document of 34.9% (with 58 ayat) while the FIDIC general contract requirements not contained in the contract document amounted to 65.1% (with 108 ayat).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analisis perbandingan, kontrak, FIDIC Comparative analysis, contracts, FIDIC
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 04 Sep 2025 15:40
Last Modified: 04 Sep 2025 15:40
URI: https://repository.itpln.ac.id/id/eprint/541

Actions (login required)

View Item
View Item