STUDI KASUS BEBAN MINIMUM (HOUSE LOAD) UNTUK MENJAGA BERKELANJUTANNYA BEROPERASI PLTU PADA PLTU INDRAMAYU

YURIARTO, TONAS and SUMANI, SAMBODHO (2014) STUDI KASUS BEBAN MINIMUM (HOUSE LOAD) UNTUK MENJAGA BERKELANJUTANNYA BEROPERASI PLTU PADA PLTU INDRAMAYU. Diploma thesis, ITPLN.

[thumbnail of skripsi studi kasus beban minimum (house load) pada pltu ind.pdf] Text
skripsi studi kasus beban minimum (house load) pada pltu ind.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Pembangkit Listrik Tenaga Uap (PLTU) melakukan perubahan energi yang terjadi secara sederhana diawali dengan perubahan energi yang terkandumg dalam bahan bakar, dengan melalui suatu proses pembakaran (secara kimia), diubah menjadi energi panas (thermis), selanjutnya menjadi energi mekanis dan pada akhirnya menjadi energi listrik. House Load ialah kondisi PLTU yang berbeban hanya untuk pemakaian sendiri. Load Rejection adalah salah satu sebab house load dapat terjadi. Kenaikan beban akan menyebabkan penurunan kecepatan generator sehingga governor akan menambah bukaan steam atau uap yang masuk ke turbin untuk tetap menjaga kecepatan putar turbin agar tetap stabil. Jika governor mengalami kendala maka akan dapat menyebabkan unit trip dan yang terburuk akan menyebabkan padamnya jaringan. Terjadinya frekuensi rendah yang berkepanjangan juga akan dapat menyebabkan terjadinya pemadaman jaringan. Untuk menghindari hal tersebut load shedding harus diterapkan, sebab pembangkit listrik tenaga uap berbahan bakar batu bara memerlukan waktu untuk kembali berproduksi.

The transfer energy that contain in the coal fired steam power plant is from the fired process (chemical process) and then transfered to thermal energy, then become a mechanic energy and last transferred again to become electrical energy. House load is a condition when a steam power plant is produce energy for himself. Load rejection is one of the reason house load can happen. An increase of load will cause a decrease in speed and the unit governor will increase the mechanical power in put to restore the speed or frequency. The response of the governor for recovering the frequency in such a shortage of generation may cause overload to the most sensitive generating unit and may trip it and will caused a cascaded collapse of the system. Prolonged low frequency operation will also caused under frequency relays of the generating unit to trip and may also caused a cascaded collapse of the system. For avoiding cascaded collapse and damage a load shedding scheme must be implemented. After load shedding restoration must be implemented. With steam power plant dominant, especially when they were shut down will become complicated.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pembangkit Listrik Tenaga Uap, House Load, Load Rejection. Steam Power Plant, House Load, Load Rejection.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 05 Mar 2026 06:34
Last Modified: 05 Mar 2026 06:34
URI: https://repository.itpln.ac.id/id/eprint/5746

Actions (login required)

View Item
View Item