ANALISIS RISIKO DAN PERENCANAAN INSPEKSI PADA BOILER WALLTUBE DENGAN METODE RISK BASED INSPECTION

PUTRA, BIMA ALIF and Fatah, Martin Choirul (2021) ANALISIS RISIKO DAN PERENCANAAN INSPEKSI PADA BOILER WALLTUBE DENGAN METODE RISK BASED INSPECTION. Diploma thesis, ITPLN.

[thumbnail of 7.6_Bima Alif Putra_201712069_Skripsi (1).pdf] Text
7.6_Bima Alif Putra_201712069_Skripsi (1).pdf
Restricted to Repository staff only

Download (3MB)

Abstract

Komponen boiler walltube pada Pembangkit Listrik Tenaga Uap rentan terhadap terjadinya kegagalan. Oleh karena itu, menganalisa risiko sangat baik dilakukan untuk mengurangi terjadinya kegagalan. Risk based inspection adalah sebuah metode inspeksi yang menggunakan risiko sebagai dasar untuk menentukan dan mengelompokan suatu peralatan yang beresiko mengalami kerusakan agar dapat ditentukan waktu inspeksinya. Tujuan dari penelitian ini adalah untuk mengetahui kategori risiko dari komponen boiler walltube dengan metode risk based inspection dengan standart API 581. Hasil penelitian diperoleh yaitu nilai dari probabilitas kegagalan yaitu 0,00734 kegagalan/tahun dan untuk nilai dari konsekuensi kegagalan pada boiler walltube yaitu 132,372 m2. Maka, didapatkan kategori risiko pada boiler walltube yaitu pada kategori medium-high risk. Maka metode inspeksi yang tepat dilakukan yaitu melakukan visual inspection, ultrasonic thickness dan radiographic test yang dilakukan setiap 48 bulan waktu pengoperasian.

Boiler walltube in Steam Power Plants are prone to failure. Therefore, analyzing the risk is very well to reduce the occurrence of failure. Risk based inspection is an inspection methode that use risk as a basis for determining and grouping a piece of equipment that is at risk of damage in order to determine the time of inspection.The purpose of this study was to find out the risk category of boiler walltube components with API 581 standart risk based inspection methods. The results of the study obtained the value of the probability of failure is 0,00734 failures/year and for the value of the consequences of failure on the walltube boiler which is 132,372 m2. So, there is a risk category of boiler walltube is medium-high risk. The right methode to use on inspection is visual inspection, ultrasonic thickness and radiographic tests that are carried out every 48 months of operation time.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Risk Based Inspection, Walltube, API 581 Risk Based Inspection, Walltube, API 581
Subjects: Skripsi
Bidang Keilmuan > Teknik Mesin
Divisions: Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin
Depositing User: Nurul Hidayati
Date Deposited: 07 Sep 2025 06:19
Last Modified: 07 Sep 2025 06:19
URI: https://repository.itpln.ac.id/id/eprint/589

Actions (login required)

View Item
View Item