ANALISA PERFORMA TUBULAR AIR HEATER SEBELUM DAN SESUDAH OVERHAUL DENGAN VARIASI BEBAN UNIT 1 PT PLN (Persero) UPK OMBILIN 2×100 MW

PUTRA, WANDRA MURSA and Hendri, Hendri (2021) ANALISA PERFORMA TUBULAR AIR HEATER SEBELUM DAN SESUDAH OVERHAUL DENGAN VARIASI BEBAN UNIT 1 PT PLN (Persero) UPK OMBILIN 2×100 MW. Diploma thesis, ITPLN.

[thumbnail of 5.4_Wandra Mursa Putra_201712051_Revisi Skripsi.pdf] Text
5.4_Wandra Mursa Putra_201712051_Revisi Skripsi.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

PT PLN (Persero) UPK Ombilin menggunakan pemanas awal udara tipe stein industrie tubular 2 Burdles. Pada bulan September 2019 telah dilakukan penggantian elemen pemanas dan pembersihan tube pada air preheater unit 1 . Penggantian elemen dilakukan karena adanya endapan abu atau blocking elemen yang melebihi batas toleransi dan tidak dapat lagi dibersihkan menggunakan sootblower. Pengamatan dilakukan pada air preheater unit 1 untuk kondisi sebelum dan sesudah penggantian elemen pemanas dan pembersihan tube dengan parameter kinerja berupa kebocoran udara (AL), efisiensi sisi gas (GSE), dan X-ratio (Xr). Analisis kinerja dilakukan dengan menggunakan ASME PTC 4.3 sebagai landasan teori. Hasil perhitungan yang dilakukan AL terbaik pada elemen lama yaitu sebesar 22,21% pada beban 85 MW dan AL terbaik pada elemen baru yaitu sebesar 10,91 % pada beban 85. Nilai GSE terbaik pada elemen lama yaitu sebesar 49,04 % pada beban 75 MW dan nilai GSE terbaik pada elemen baru yaitu sebesar 59,28 % pada beban 85 MW. Nilai Xr terbaik pada elemen lama yaitu pada sebesar 0,4922 % pada beban 95 MW dan nilai Xr terbaik pada elemen baru yaitu sebesar 0,6827 % pada beban 85 MW.

PT PLN (Persero) UPK Ombilin uses an air preheater of the stein industrie tubular 2 Burdles type. In September 2019 the heating element was replaced and the tube cleaning was carried out on the air preheater unit 1 . Replacement of elements is carried out due to ash deposits or blocking elements that exceed the tolerance limit and can no longer be cleaned using a sootblower. Observations were made on the air preheater unit 1 for conditions before and after replacing the heating element and cleaning the tube with performance parameters such as air leakage (AL), gas side efficiency (GSE), and X-ratio (Xr). Performance analysis was carried out using ASME PTC 4.3 as the theoretical basis. The results of the calculations carried out by the best AL on the old element is 22.21% at a load of 85 MW and the best AL on the new element is 10.91% at a load of 85. The best GSE value for the old element is 49.04 % at a load of 75 MW and the best GSE value for the new element is 59.28% at a load of 85 MW. The best Xr value for the old element is 0.4922% at a load of 95 MW and the best Xr value for the new element is 0.6827% at a load of 85 MW.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Tubular air heater, Performance, ASME PTC 4.3 Tubular air heater, performa, ASME PTC 4.3
Subjects: Skripsi
Bidang Keilmuan > Teknik Mesin
Divisions: Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin
Depositing User: Nurul Hidayati
Date Deposited: 08 Sep 2025 02:31
Last Modified: 08 Sep 2025 02:31
URI: https://repository.itpln.ac.id/id/eprint/611