Abstract
Suatu daerah pemukiman baru perlu dibangun suatu sistem tegangan rendah untuk mengelektrifikasi daerah tersebut. Untuk itu perlu dibuat suatu perencanaan yang memenuhi persyaratan teknik dimana perlu diketahui tahapan pembangunan dari perumahan tersebut dan asumsi beban per rumah. Oleh karena itu pembangunan perumahan tersebut dilakukan secara bertahap, maka sistem jaringan distribusi tegangan rendahnya perlu disesuaikan agar diperoleh harga yang minimum. Sistem jaringan distribusi tegangan rendah yang dimaksud meliputi, pencabangan tegangan menengah, gardu distribusi dan jaringan tegangan rendah. Untuk mendapatkan biaya pembangunan yang minimum dan memenuhi persyaratan perlu dijabarkan cara menentukan luas areal, beban dan penampang saluran yang optimum, Dalam hal ini biaya perencanaan dari suatu sistem distribusi jaringan tegangan rendah terdiri dari dua bagian, yaitu biaya tetap ( Fixed cost ) dan biaya tidak tetap ( variabel cost ).
A new residential area requires a construction of a low voltage system to electrify the area. To make it done, it needs a plan that meets the technical requirements which will require the stage of establishment of the residential and the assumption of load per house to be known. Because of the housing establishment that has to be done in gradual stage, the low voltage distribution network system needs to be adjusted in order to obtain a minimum price. The low voltage distribution network system may include, medium voltage branching, distribution substations and low voltage networks. To obtain the minimum development costs that meet the necessary requirements, it needs to be set out how to determine the total area size, the load and the optimum cross-section of the channel. In this case, the cost of the construction of a low-voltage distribution network system consists of two parts, namely the fixed costs and variable cost.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Perencanaan, Perumahan, Biaya Development, Residential, Cost |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 09 Mar 2026 10:30 |
| Last Modified: | 09 Mar 2026 10:30 |
| URI: | https://repository.itpln.ac.id/id/eprint/6112 |