MARFIANSYAH, M ALWAN and Hendri, Hendri (2021) ANALISIS EFISIENSI TURBIN UAP DENGAN METODE HEATRATE PADA SAAT PERFOMANCE TEST SEBELUM DAN SESUDAH OVERHAUL DI PLTU JERANJANG OMU UNIT 3. Diploma thesis, ITPLN.
![[thumbnail of 5.3_M Alwan Marfiansyah_201712042_skripsi_Finall.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
5.3_M Alwan Marfiansyah_201712042_skripsi_Finall.pdf
Restricted to Repository staff only
Download (4MB)
Abstract
Pembangkit Listrik Tenaga Uap (PLTU) adalah pembangkit listrik yang memanfaatkan panas dan dihasilkan dari uap air untuk menggerakkan turbin menggunakan energi kinetik
yang dapat menghasilkan listrik melalui generator. Untuk mengetahui performa turbin diketahui menggunakan turbin heat rate. Penelitian ini bertujuan untuk mengetahui
perhitungan dan analisis efisiensi turbin pada saat commissioning, performance test sebelum dan sesudah overhaul. Pengambilan data dilakukan dengan metode observasi di PLTU JERANJANG OMU Unit 3. Untuk mengetahui nilai Heat Rate pada siklus turbin uap menggunakan metode perhitungan berdasarkan kesetimbangan massa uap “steam” dan energi dalam “entalpi” yang masuk dan keluar turbin dengan daya keluaran generator. Efisiensi turbin uap dapat dilihat dari energi panas yang dimasukkan untuk menghasilkan listrik sebesar 1 kwh dan turbin heat rate. Hasil penelitian ini yaitu efisiensi turbin diperoleh kurva pada commissioning sebelum overhaul dengan nilai tertinggi pada bulan Agustus sebesar 31,043% dan nilai terendah pada bulan September sebesar 30,95% dan sesudah overhaul dengan nilai tertinggi pada bulan Januari sebesar 32,524% dan nilai terendah pada bulan Februari sebesar 29,022%.
Steam Power Plant (PLTU) is a power plant that utilizes heat and is generated form water vapor to drive a turbine using kinetic energy that can generate electricity through a
generator. To determine the performance of the turbine, it’s known to use turbine heat rate. This study aims to determine the calculation and analysis of turbine efficiency during
commissioning, performance tests before and after overhaul. Data retrieval is done by observation method at PLTU Jeranjang OMU Unit 3. To determine the value of heat rate
in the steam turbine cycle using a calculation method based on the mass balance of steam “steam” and the energy in “entalphy” entering and leaving the turbine with generator
output power. The efficiency of steam turbine can be seen from the heat energy entered to produce 1 kWh of electricity and the turbine heat rate. The results of this study are
turbine efficiency curves obtained on commissioning before overhaul with the highest value in August of 31,043% and the lowest value in September of 30,95% and after overhaul with the highest value in January of 32,524% and the lowest value in February of 29,022%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | steam turbine, turbine heat rate, performance test,commissioning, steam turbine efficiency turbin uap, turbin heat rate, performance test, commissioning, efisiensi turbin uap |
Subjects: | Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin |
Depositing User: | Nurul Hidayati |
Date Deposited: | 08 Sep 2025 02:41 |
Last Modified: | 08 Sep 2025 02:41 |
URI: | https://repository.itpln.ac.id/id/eprint/613 |