Miranda, Nabela Priska and Sepriyanna, Irma (2024) ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN RAFT FOUNDATION DI PROYEK PEMBANGUNAN GEDUNG BSI TOWER – JAKARTA PUSAT. Diploma thesis, ITPLN.
![[thumbnail of Final Skripsi_Nabela Priska Miranda_202021057.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
Final Skripsi_Nabela Priska Miranda_202021057.pdf
Restricted to Repository staff only
Download (5MB)
Abstract
Raft foundation (fondasi rakit) sangat penting bagi struktur suatu bangunan yang berfungsi sebagai penerus beban bangunan kelapisan tanah dasar atau batu – batuan yang ada dibawahnya. Pada penelitian ini mengamati produktivitas alat berat pada pekerjaan raft foundation BSI Tower yang bertempatkan di Jl. Medan Merdeka Selatan, Kecamatan Gambir, Jakarta Pusat. Alat berat yang diteliti yaitu Excavator, Tower Crane, dan Truck Mixer. Sangat penting untuk memastikan keberhasilan proyek salah satu caranya dengan menganalisis produktivitas alat berat yang digunakan. Perhitungan dan pengolahan data untuk mendapatkan analisis data dilakukan setelah mendapatkan data primer yang didapatkan dengan melakukan pengamatan secara langsung dan data sekunder yang diperoleh dengan mengumpulkan data dari pihak yang berwenang. Penelitian yang dilakukan menunjukkan bahwa pada pekerjaan raft foundation di zona 1A untuk volume galian adalah 409 m3, volume tulangan besi yang diangkut 34686,48 kg, dan volume ready mix sebesar 436 m3. Pada alat excavator durasi dilapangan adalah 2 jam 37 menit setelah dianalisis produktivitasnya adalah 1 jam 33 menit. Durasi pada alat tower crane pada kondisi di lapangan adalah 50 menit 43 detik kondisi analisis produktivitas durasinya 49 menit 56 detik. Sedangkan durasi pada alat truck mixer pada saat kondisi di lapangan 16 jam 20 menit setelah dianalisis produktivitasnya durasinya 12 jam 36 menit. Durasi pada alat truck mixer pada kondisi di lapangan 16 jam 20 menit setelah dianalisis produktivitasnya diketahui 12 jam 36 menit. Nilai produktivitas excavator adalah 4,41 m3/jam, nilai produktivitas tower crane adalah 40617 kg/jam, dan untuk nilai produktivitas truck mixer adalah 34,62 m3/jam.
Raft foundation (raft foundation) is very important for the structure of a building that functions as a successor to the building's load on the bedsoil or rocks underneath. In this study, the productivity of heavy equipment was observed in the raft foundation work of BSI Tower located on Jl. Medan Merdeka Selatan, Gambir District, Central Jakarta. The heavy equipment studied is Excavator, Tower Crane, and Truck Mixer. It is very important to ensure the success of the project, one of the ways is by analyzing the productivity of the heavy equipment used. Data calculation and processing to obtain data analysis is carried out after obtaining primary data obtained by conducting direct observation and secondary data obtained by collecting data from the authorities. The research conducted shows that in the raft foundation work in zone 1A, the excavation volume is 409 m3, the volume of iron reinforcement transported is 34686.48 kg, and the ready mix volume is 436 m3. In excavators, the duration in the field is 2 hours and 37 minutes after analyzing the productivity is 1 hour and 33 minutes. The duration of the tower crane in field conditions is 50 minutes 43 seconds, the duration of the productivity analysis condition is 49 minutes 56 seconds. Meanwhile, the duration of the truck mixer during the conditions in the field is 16 hours and 20 minutes after analyzing the productivity of the duration is 12 hours and 36 minutes. The duration of the truck mixer in field conditions is 16 hours and 20 minutes after analyzing the productivity, it is known to be 12 hours and 36 minutes. The productivity value of the excavator is 4.41 m3/hour, the productivity value of the tower crane is 40617 kg/hour, and the productivity value of the truck mixer is 34.62 m3/hour.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Produktivitas, Pengamatan Langsung, Alat Berat, Raft Foundation Productivity, Direct Observation, heavy equipment, Raft Foundation |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 08 Sep 2025 08:13 |
Last Modified: | 08 Sep 2025 08:13 |
URI: | https://repository.itpln.ac.id/id/eprint/644 |