ANALISIS PRODUKTIVITAS PEKERJA DENGAN MENGGUNAKAN METODE TIME STUDY PADA PEKERJAAN BALOK DAN KOLOM LANTAI 12 PROYEK PEMBANGUNAN STRUKTUR OFFICE TOWER PIK2

Nasrullah H, Muh Asmar and Kustanrika, Irma Wirantina (2024) ANALISIS PRODUKTIVITAS PEKERJA DENGAN MENGGUNAKAN METODE TIME STUDY PADA PEKERJAAN BALOK DAN KOLOM LANTAI 12 PROYEK PEMBANGUNAN STRUKTUR OFFICE TOWER PIK2. Diploma thesis, ITPLN.

[thumbnail of FINAL SKRIPSI MUH ASMAR NASRULLAH H 201921076(1).pdf] Text
FINAL SKRIPSI MUH ASMAR NASRULLAH H 201921076(1).pdf
Restricted to Repository staff only

Download (12MB)

Abstract

Implementasi keterlambatan sering dijumpai saat menyelesaikan proyek pembangunan. Hal ini disebabkan oleh fakta bahwa produktivitas pekerja kurang dipertimbangkan saat membuat jadwal proyek. Hal ini menyebabkan ketidakcocokan antara waktu berjalan. Data dikumpulkan melalui pengamatan pekerjaan yang dihitung Produktivitasnya di lapangan. Pekerjaan yang diobservasi di lapangan mencakup proses pembesian, pembuatan bekisting, dan pengecoran. Adapun terdapat beberapa faktor yang memengaruhi produktivitas karyawan dalam lingkungan kerja bekisting, seperti lokasi area kerja dalam kaitannya dengan alokasi waktu, tipe material yang dipakai, dan jumlah pekerja yang terlibat. Sementara itu, jarak antara material dengan tempat kerja dan jumlah pekerja merupakan variabel yang mempengaruhi produktivitas pekerja dalam pekerjaan tulangan. Jumlah pekerja dan penggunaan peralatan dalam bekerja juga berdampak pada produktivitas pekerja dalam pengecoran, yang mengakibatkan rendahnya produktivitas. Nilai rata-rata produktivitas pekerja pada pekerjaan bekisting kolom 11,11 m2/Hari/Orang, pada pekerjaan tulangan kolom 545,21 Kg/Kari/Orang, pada pekerjaan pengecoran kolom 5,12 m3/Hari/Orang, dan pada pekerjaan Pemasangan balok precast Bekisting balok 10,96 m2/Hari/Orang, Tulangan balok 1240,78 Kg/Hari/Orang, dan Pengecoran balok 6,21 m3/Hari/Orang

Implementation delays are often encountered when completing development projects. This is due to the fact that worker productivity is less considered when creating project schedules. This causes a mismatch between the running times. Data is collected through observing work and calculating productivity in the field. The work observed in the field included the ironing, formwork and casting processes. There are several factors that influence employee productivity in a formwork work environment, such as the location of the work area in relation to time allocation, the type of material used, and the number of workers involved. Meanwhile, the distance between the material and the workplace and the number of workers are variables that influence worker productivity in reinforcing work. The number of workers and equipment used in work also has an impact on worker productivity in foundries, resulting in low productivity. The average value of worker productivity in column formwork work is 11.11 m2/Day/Person, in column reinforcement work 545.21 Kg/Kari/Person, in column casting work 5.12 m3/Day/Person, and in beam installation work precast Beam formwork 10.96 m2/Day/Person, Beam reinforcement 1240.78 Kg/Day/Person, and Beam casting 6.21 m3/Day/Person

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Produktivitas, Waktu, Tenaga Kerja, Observasi Productivity, Time, Labor, Observation
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 09 Sep 2025 02:07
Last Modified: 09 Sep 2025 02:07
URI: https://repository.itpln.ac.id/id/eprint/667