Abstract
Building Information Modelling (BIM) merupakan salah satu bentuk dari konstruksi digital. Implementasi teknologi ini memiliki keunggulan mengintegrasikan biaya serta waktu yang membantu reaktualisasi real time dan melakukan proses evaluasi dan pemantauan yang efisien sepanjang fase proyek. Metode penelitian yang digunakan adalah metode BIM dengan memodelkan 3 dimensi menggunakan software Revit Autodesk yang nantinya output-an dari pemodelan 3 dimensi akan di input kedalam software Naviswork Autodesk untuk diberikan schedule sebagai bentuk pemodelan 4 dimensi sehingga dapat menghasilkan output costing (5 dimensi) pembangunan dari perancangan yang dilakukan. Hasil dari penelitian ini diperoleh volume pekerjaan beton dan besi berdasar Building Information Modeling untuk struktur borepile memiliki volume pekerjaan beton sebesar 478,40 m³ dan volume pekerjaan besi sebesar 57566,24 kg, untuk struktur pilecap dan lc memiliki volume pekerjaan beton sebesar 117,50 m³ dan volume pekerjaan besi sebesar 13339,02 kg, untuk sturktur pier memiliki volume pekerjaan beton sebesar 64,20 m³ dan volume pekerjaan besi sebesar 14522,59 kg, untuk struktur pierhead memiliki volume pekerjaan beton sebesar 61,10 m³ dan volume pekerjaan besi sebesar 7080,78 kg. Hasil perancangan Building Information Modeling berbasis 5D menunjukan angka sebesar Rp4.404.619.483,49 untuk total costing yang telah dipengaruhi oleh waktu lama pengerjaan dan biaya serta ketersediaan sumber daya.
Building Information Modelling (BIM) is one form of digital construction. The implementation of this technology has the advantage of integrating cost and time which helps real-time reactualisation and conducts an efficient evaluation and monitoring process throughout the project phase. The research method used is the BIM method by modeling 3 dimensions using Autodesk Revit software which later outputs from 3 dimensional modeling will be input into Autodesk Naviswork software to be given a schedule as a form of 4-dimensional modeling to produce a costing output (5 dimensions) of the construction of the design carried out. The results of this study obtained the volume of concrete and ironwork based on Building Information Modeling for the bore pile structure has a concrete work volume of 478.40 m³ and an ironwork volume of 57566.24 kg, for the pile cap and lc structure has a concrete work volume of 117.50 m³ and an ironwork volume of 13339.02 kg, for the pier structure has a concrete work volume of 64.20 m³ and an ironwork volume of 14522.59 kg, for the pierhead structure has a concrete work volume of 61.10 m³ and an ironwork volume of 7080.78 kg. The results of the 5D-based Building Information Modeling design show a figure of Rp4,404,619,483.49 for total costing which has been influenced by the duration of work and the cost and availability of resources.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Perancangan, BIM 5D, Revit, Naviswork Design, 5D BIM, Revit, Naviswork |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |