Zakaria, Dika Surya and Kusumastuti, Dyah Pratiwi (2019) ANALISIS KONSOLIDASI TANAH DENGAN METODE PREFABRICATED VERTICAL DRAINS (PVD) PADA PROYEK PEMBANGUNAN RUNWAY 3 SECTION 1 BANDAR UDARA INTERNASIONAL SOEKARNO – HATTA. Diploma thesis, ITPLN.
![[thumbnail of Analisis Konsolidasi Tanah dengan Metode Prefabricated Vertical Drains (PVD) pada Proyek Pembangunan Runway 3 Section 1 B~1.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
Analisis Konsolidasi Tanah dengan Metode Prefabricated Vertical Drains (PVD) pada Proyek Pembangunan Runway 3 Section 1 B~1.pdf
Restricted to Repository staff only
Download (3MB)
Abstract
Peningkatan pelayanan di Bandara Soekarno-Hatta perlu ditunjang dengan infrastruktur yang memadai. Pembangunan Runway 3 merupakan salah satu upaya peningkatan kapasitas bandara. Pada tahap perencanaan, penyelidikan tanah awal menunjukkan adanya lapisan tanah lunak pada lokasi proyek. Sehingga diputuskan untuk melakukan perbaikan tanah dasar menggunakan Prefabricated Vertical Drains (PVD). Analisis konsolidasi dilakukan dengan mencari lama waktu dan besarnya penurunan konsolidasi tanah dasar yang diperoleh dari perhitungan. Prefabricated Vertical Drains (PVD) divariasikan dalam ketebalan, pola dan jaraknya sehingga didapat perbandingan nilai waktu (t) dan besar penurunan (Sc). Variasi dibuat untuk mendapatkan kombinasi pemasngan Prefabricated Vertical Drains (PVD) yang paling tepat untuk perbaiakan tanah pada lokasi penelitian. Hasil penelitian menunjukkan waktu yang dibutuhkan tanah asli untuk mencapai konsolidasi 90% adalah 1912366931 hari. Sedangkan setalah dilakukan perbaikan tanah dengan metode preloading yang dikombinasikan dengan Prefabricated Vertical Drains (PVD) tanah hanya membutuhkan waktu 105 hari untuk mencapai penurunan konsolidasi 90 %.
Improved services at Soekarno-Hatta Airport need to be supported by adequate infrastructure. The construction of Runway 3 is an effort to increase airport capacity. At the planning stage, the initial soil investigation shows the presence of soft soil at the project site. So it was decided to make subgrade improvements using Prefabricated Vertical Drains (PVD). Consolidation analysis is carried out by looking for the length of time and the magnitude of decline in the consolidation of subgrade obtained from calculations. Prefabricated Vertical Drains (PVD) varied in thickness, pattern and distance to obtain a comparison of the time value (t) and the magnitude of decrease (Sc). Variations were made to obtain the most suitable combination of Prefabricated Vertical Drains (PVD) for soil repair at the study site. The results showed that the time taken for the original land to reach 90% consolidation was 1912366931 day. Whereas after soil improvement is done using the preloading method combined with Prefabricated Vertical Drains (PVD) the soil only takes 105 days to achieve a consolidation reduction of 90%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Konsolidasi 90%, Perbaikan Tanah, Prefabricated Vertical Drains (PVD), Preloading. Consolidation 90%, Soil Improvement, Prefabricated Vertical Drains (PVD), Preloading. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 09 Sep 2025 06:35 |
Last Modified: | 09 Sep 2025 06:35 |
URI: | https://repository.itpln.ac.id/id/eprint/718 |