Killana S, Endangsah and Hastanto, Hastanto (2019) OPTIMALISASI PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE PERT (STUDI KASUS : DOWNSTREAM REGULATING DAM PLTA JATIGEDE SUMEDANG). Diploma thesis, ITPLN.
![[thumbnail of ENDANGSAH KILLANA S.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
ENDANGSAH KILLANA S.pdf
Restricted to Repository staff only
Download (5MB)
Abstract
Keberhasilan ataupun kegagalan dari pelaksanaan proyek sering kali disebabkan kurang terencananya kegiatan proyek serta pengendalian yang kurang efektif,sehingga kegiatan proyek tidak efisien, hal ini akan mengakibatkan keterlambatan, menurunnya kualitas pekerjaan, dan membengkaknya biaya pelaksanaan. manajemen proyek dilakukan untuk mengelola proyek dari awal hingga proyek berakhir. Untuk mengembalikan tingkat kemajuan proyek ke rencana semula, maka diperlukan suatu upaya percepatan durasi pada pelaksanaan proyek. Dan probabilitas digunakan untuk mencari kemungkinan waktu proyek dapat selesai pada tepat waktu. Tujuan dari penelitian ini adalah untuk mengetahui proses dari metode PERT dalam menyusun jadwal ataupun waktu pelaksanaan tiap jenis pekerjaan sehingga dapat ditentukan waktu yang dibutuhkan untuk melaksanakan pekerjaan Konstruksi dan mengetahui probabilitas selesainya proyek yang harus dikeluarkan. Hasil menunjukkan bahwa penyelesaian proyek memakan waktu selama 1245 hari. Dengan probabilitas kemungkinan proyek dapat diselesaikan dengan waktu paling cepat selama 1207 hari dengan kemungkinan 0,14 %, paling lambat 1283 hari dengan kemungkinan 99,86 %, dan paling mungkin diselesaikan selama 1245 hari dengan kemungkinan 53,19%.
Success or failure of project implementation is often caused by the lack of planned project activities and controls that are less effective, so that project activities are inefficient, this will result in delays, decreased quality of work, and swelling costs. Project management is carried out to manage the project from the beginning until the project ends. To restore the progress of the project to its original plan, an effort to accelerate the duration of the project is needed. And probability is used to look for possible time the project can be completed on time. The purpose of this study is to determine the process of the PERT method in compiling a schedule or time of implementation of each type of work so that it can be determined the time needed to carry out construction work and find out the probability of completion of the project that must be issued. The results show that the completion of the project takes 1245 days. With the probability the possibility of the project can be completed with the fastest time for 1207 days with a possibility of 0.14%, at the latest 1283 days with a possibility of 99.86%, and most likely to be completed for 1245 days with the possibility of 53.19%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Waktu pelaksanaan, Metode PERT, Probabilitas. Implementation time, PERT Method, Probability. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 09 Sep 2025 07:06 |
Last Modified: | 09 Sep 2025 07:06 |
URI: | https://repository.itpln.ac.id/id/eprint/727 |