BOANGMANALU, OPY TAMI and NURHASANAH, ROSWATI (2024) EFISIENSI THERMAL SEBELUM DAN SESUDAH COMBUSTER INSPECTION PLTGU BLOK 3 UNIT 2 PT PLN NUSANTARA POWER UP GRESIK. Diploma thesis, ITPLN.
![[thumbnail of TUGAS AKHIR_OPY TAMI BOANGMANALU_202012081.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
TUGAS AKHIR_OPY TAMI BOANGMANALU_202012081.pdf
Restricted to Repository staff only
Download (5MB)
Abstract
Penelitian ini bertujuan untuk menganalisis efisiensi termal pada Pembangkit Listrik Tenaga Gas dan Uap (PLTGU) di PT PLN (Persero) Nusantara Power Unit Pembangkitan (UP) Gresik sebelum dan sesudah pelaksanaan inspeksi pembakaran (combustion inspection). Efisiensi termal merupakan parameter kunci dalam menilai kinerja sebuah pembangkit listrik, yang dipengaruhi oleh berbagai faktor seperti kondisi mesin, peralatan, dan proses pembakaran. Dalam penelitian ini, dilakukan pengukuran dan analisis data operasional PLTG untuk mengevaluasi perubahan efisiensi termal akibat inspeksi pembakaran. Data yang digunakan meliputi temperatur, tekanan, dan konsumsi bahan bakar sebelum dan sesudah inspeksi. Peneliti bisa mendapatkan hasil penelitian dari efisiensi termal, dari hasil perhitungan sebelum combustion inspection yang diperoleh dari perhitungan beban 50MW sebesar 24,897 %, sedangkan sesudah combustion inspection pada perhitungan beban 50 MW sebesar 23,934%. Beban 100 MW sebelum combustion inspection memiliki efisiensi thermal sebesar 29,621%, sedangkan sesudah combustion inspection beban 100 MW memiliki efisiensi sebesar 29,958%
This study aims to analyze the thermal efficiency of the Gas and Steam Power Plant (PLTGU) at PT PLN (Persero) Nusantara Power Gresik Generating Unit (UP) before and after the implementation of combustion inspection. Thermal efficiency is a key parameter in assessing the performance of a power plant, which is influenced by various factors such as engine condition, equipment, and combustion process. In this study, measurements and analysis of PLTG operational data were conducted to evaluate changes in thermal efficiency due to combustion inspection. The data used includes temperature, pressure, and fuel consumption before and after inspection. Researchers can get research results from thermal efficiency, from the calculation results before combustion inspection obtained from the calculation of 50 MW load of 24.897%, while after combustion inspection at 50 MW load calculation of 23.934%. 100 MW load before combustion inspection has a thermal efficiency of 29.621%, while after combustion inspection 100 MW load has an efficiency of 29.958%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Efisiensi Thermal, Combustion Inspection, Temperatur Ideal Thermal Efficiency, Combustion Inspection, Ideal Temperature |
Subjects: | Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin |