ANALISIS WASTE DENGAN PENERAPAN METODE LEAN CONSTRUCTION PADA PEKERJAAN KOLOM BALOK DAN PLAT LANTAI PROYEK PEMBANGUNAN TRANS PARK CIBUBUR

Yunisa, Rina and Artiani, Gita Puspa (2019) ANALISIS WASTE DENGAN PENERAPAN METODE LEAN CONSTRUCTION PADA PEKERJAAN KOLOM BALOK DAN PLAT LANTAI PROYEK PEMBANGUNAN TRANS PARK CIBUBUR. Diploma thesis, ITPLN.

[thumbnail of RINA YUNISA.pdf] Text
RINA YUNISA.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Keterlambatan waktu pelaksanaan masih menjadi masalah utama dunia konstruksi Indonesia, sehingga diperlukan manajemen waktu yang baik untuk mengurangi risiko keterlambatan yang terjadi. Salah satu metode lean construction untuk memanajemen waktu dalam menangani keterlambatan terdapat pada aplikasi last planner system. Aplikasi last planner system (LPS) merupakan aplikasi yang relatif belum banyak diimplementasikan pada proyek konstruksi. Pada penelitian ini bertujuan untuk mengetahui dan meminimalisir waste yang terjadi pada area hotel proyek Trans Park Cibubur. Proses identifikasi waste dan analisis data dilakukan secara manual menggunakan metode aplikasi LPS. Hasil penelitian menunjukkan bahwa PPC (Percent Plan Complete) pada tiga hari peninjauan sebesar 39 % sehingga terdapat 61% sisa pekerjaan yang tidak selesai dan dari 61% ini memiliki faktor dominan yang menyebabkan keterlambatan proyek adalah faktor manajerial yang meliputi perubahan gambar dan adiministrasi keuangan pekerja.

Delay in implementation time is still a major problem in the Indonesian construction world, so good time management is needed to reduce the risk of delays that occur. One lean construction method for managing time in handling delays is in the last planner system application. The last planner system (LPS) application is a relatively few applications that have been implemented in construction projects. In this study aims to determine and minimize waste that occurs in the Trans Park Cibubur project hotel area. The process of identifying waste and analyzing data is done manually using the LPS application method. The results showed that the PPC (Percent Plan Complete) on the three days of review was 39% so there were 61% of the remaining work unfinished and of this 61% had a dominant factor causing project delays was managerial factors which included changes in the image and administration of workers' finances.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: waste, penerapan lean construction, last planner system (LPS) waste, implementation of lean construction, last planner system
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 09 Sep 2025 07:11
Last Modified: 09 Sep 2025 07:11
URI: https://repository.itpln.ac.id/id/eprint/730

Actions (login required)

View Item
View Item