ANALISIS FAKTOR – FAKTOR PENYEBAB TERJADINYA ADDENDUM KONTRAK PADA KONTRAK HARGA SATUAN PROYEK KONSTRUKSI GEDUNG FASILITAS PERKERETAAPIAN STASIUN MANGGARAI

Pelawi, Yeshivera and Siswoyo, Sriyono D (2019) ANALISIS FAKTOR – FAKTOR PENYEBAB TERJADINYA ADDENDUM KONTRAK PADA KONTRAK HARGA SATUAN PROYEK KONSTRUKSI GEDUNG FASILITAS PERKERETAAPIAN STASIUN MANGGARAI. Diploma thesis, ITPLN.

[thumbnail of Skripsi Yeshivera Pelawi.pdf] Text
Skripsi Yeshivera Pelawi.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Perubahan kontrak didahului oleh perubahan pekerjaan. Sapulette (2009) menyebutkan bahwa perubahan pekerjaan akan mengakibatkan peningkatan biaya dan waktu pelaksanaan proyek (cost), serta berpotensi mengakibatkan kerugian bagi kontraktor atau menimbulkan konflik diantara pihak yang terikat kontrak. Penelitian ini bertujuan untuk mengetahui faktor yang dominan menyebabkan terjadinya addendum kontrak pada kontrak harga satuan proyek konstruksi gedung fasilitas perkeretaapian stasiun Manggarai. Faktor ini kemudian dikelompokkan menjadi kelompok faktor kesalahan atau ketidaklengkapan dokumen, perubahan teknis, kondisi site, waktu, dan faktor eksternal. Faktor – faktor ini dipaparkan dalam kuisioner. Objek dari penelitian ini yaitu proyek gedung DDT. Kuisioner disebar kepada 37 orang karyawan kontraktor dan konsultan. Jawaban responden yang terkumpul sebanyak 37 kuisioner. Data yang terkumpul dianalisa dengan statistik nonparametrik Kendall W menggunakan program Statistical Product and Service Solution (SPSS) Versi 25. Dari hasil analisa statistik didapat dua item faktor dominan pada masing – masing kelompok faktor. Kelompok faktor yang dominan yaitu kelompok faktor waktu dengan nilai Kendall W sebesar 0,815 yang berarti tingkat keselarasan jawaban di antara responden sangat kuat. Item faktor yang dominan yaitu percepatan jadwal atas permintaan owner. Hasil uji hipotesis menunjukkan adanya keselarasan jawaban diantara responden.

Contract changes are preceded by changes in employment. Sapulette (2009) said that employment changes will result in increased cost and time implementation of the project, and potentially result in losses for the contractor or a conflict between two parties under contract. This study aims to determine the cause of the dominant factors in the addendum contracts to the price contract in project construction building facility of railway manggarai station facilities . The factors were then grouped into a factor group which were errors or incomplete documents, technical changes, site condition, and external factors. These factors are described in the questionnaire. Object of this study is DDT Project. Questionnaire distributed to 37 contractors and consultant working on these project. Respondents were 37 questionnaires were collected. Collected data were analyzed with nonparametric statistics Kendal W using Statistical Product and Service Solution (SPSS) program version 25. Statistical analysis of the result it is known that two dominant factor item in each group. The dominant factor group is a time factor group with Kendal W value of 0.815, which means the level of alignment between respondents answer very strong. Dominant factor items that acceleration of the schedule at the request of the owner. Hypothesis test results showed alignment among respondents answer.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Adendum Kontrak, Kontrak Harga Satuan, Analisis Statistik Nonparametrik Kendall W. Contract Addendum, Unit Price Contract, Nonparametric Statistics Kendal W
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 09 Sep 2025 07:26
Last Modified: 09 Sep 2025 07:26
URI: https://repository.itpln.ac.id/id/eprint/735