PURBA, FERDY MARIUS and NURHASANAH, ROSWATI (2024) ANALISIS EFISIENSI THERMAL GAS TURBINE SEBELUM DAN SESUDAH OVERHAUL PADA PLTGU PT. PLN NUSANTARA POWER UP MUARA KARANG BLOK 2.2. Diploma thesis, ITPLN.
![[thumbnail of TA_Ferdy Marius Purba_202012083.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
TA_Ferdy Marius Purba_202012083.pdf
Restricted to Repository staff only
Download (3MB)
Abstract
Penelitian ini membahas mengenai analisis efisiensi thermal gas turbine, yang merupakan salah satu upaya meningkatkan performa pada Pembangkit Listrik Tenaga Gas Uap (PLTGU). Penelitian ini dibuat dengan tujuan untuk mengetahui pengaruh overhaul terhadap efisiensi thermal gas turbine. Analisis dilakukan dengan metode perhitungan efisiensi berdasarkan input dan output komponen utama gas turbine. Pengaruh overhaul pada nilai efisiensi thermal dapat dilihat dari hasil perhitungan nilai kerja kompresor, kalor yang masuk, dan kerja turbin. Setelah dilakukannya overhaul nilai kerja komponen utama gas turbine mengalami kenaikan. Dengan naiknya nilai kerja komponen utama, efisiensi thermal pada beban 135 MW mengalami kenaikan dari nilai 29,87 % menjadi 30,72 %. Kemudian pada beban 170 MW mengalami kenaikan dari 31,16 % menjadi 32,08 % dan pada beban 235 MW mengalami kenaikan dari 32,71 % menjadi 34,08 %.
This research discusses the analysis of thermal efficiency of gas turbines, which is one of the efforts to improve the performance of the Combined Cycle Power Plant (PLTGU). The research aims to determine the impact of overhaul on the thermal efficiency of gas turbines. The analysis was conducted using a method of efficiency calculation based on the input and output of the main components of the gas turbine. The effect of the overhaul on the thermal efficiency can be observed from the calculated values of compressor work, heat input, and turbine work. After the overhaul, the work values of the main components of the gas turbine increased. With the increase in the work values of the main components, the thermal efficiency at a load of 135 MW increased from 29.87% to 30.72%. Then, at a load of 170 MW, it increased from 31.16% to 32.08%, and at a load of 235 MW, it increased from 32.71% to 34.08%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | PLTGU, Overhaul, Efisiensi PLTGU, Overhaul, Efficiency |
Subjects: | Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin |
Depositing User: | Nurul Hidayati |
Date Deposited: | 09 Sep 2025 08:30 |
Last Modified: | 09 Sep 2025 08:30 |
URI: | https://repository.itpln.ac.id/id/eprint/759 |