AMSAL, HANIF and Hendri, Hendri (2024) ANALISIS PERFORMA TURBINE HEAT RATE SEBELUM DAN SESUDAH COMBUSTION INSPECTION PADA GT 2.1 PLTGU MUARA KARANG. Diploma thesis, ITPLN.
![[thumbnail of TUGAS AKHIR_ HANIF AMSAL_ 202012023.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
TUGAS AKHIR_ HANIF AMSAL_ 202012023.pdf
Restricted to Repository staff only
Download (4MB)
Abstract
Kebutuhan energi listrik pada era globalisasi saat ini merupakan hal yang sangat penting yang tidak dapat dipisahkan lagi dari kehidupan manusia. Hal ini dikarenakan kemajuan yang sangat pesat salah satunya dalam hal teknologi. Pasokan listrik tersebut salah satunya berasal dari PT.PLN NP UP Muara Karang yang melayani Kebutuhan listrik untuk wilayah Jakarta dan sekitarnya. PLTGU Muara karang di operasikan oleh PT.PLN NP UP Muara Karang yang terdiri dari 4 Blok dengan kapasitas total sebesar 2700 MW. Efisiensi sebuah turbin dipengaruhi oleh beberapa faktor, termasuk desain turbin, jenis bahan bakar yang digunakan, dan kondisi operasional turbin. Oleh karena itu, untuk meningkatkan efisiensi turbin, perlu dilakukan pemeliharaan seperti Combustion inspection untuk dilakukan pengecekan secara menyeluruh dan teliti yang sudah terjadwalkan secara periodik. Turbine Heat Rate adalah parameter yang digunakan untuk mengukur efisiensi sebuah turbin dalam mengkonversi energi panas menjadi energi listrik. Semakin rendah turbine Heat Rate, semakin efisien turbin tersebut. Dari hasil menunjukkan efisiensi thermnal sebelum dan sesudah Combustion inspection mengalami kenaikan setelah dilakukan Combustion inspection. Dari hasil perhitungan dan analisis nilai Heat Rate menunjukkan dengan beban yang sama yaitu 90 MW mengalami penurunan dari 1628,37 menjadi 1545,51 kJ/kWh sesudah dilakukan Combustion inspection. Dan terjadi peningkatan pada efisiensi thermal sebesar 22.10 % menjadi 23,29 %.
The need for electrical energy in the current era of globalization is a very important thing that can no longer be separated from human life. This is due to the rapid progress, one of which is in terms of technology. One of the electricity supplies comes from PT PLN NP UP Muara Karang which serves electricity needs for Jakarta and surrounding areas. PLTGU Muara Karang is operated by PT PLN NP UP Muara Karang which consists of 4 blocks with a total capacity of 2700 MW. The efficiency of a turbine is influenced by several factors, including turbine design, type of fuel used, and turbine operating conditions. Therefore, to improve turbine efficiency, it is necessary to carry out maintenance such as Combustion inspection to carry out a thorough and thorough check that has been scheduled periodically. Turbine Heat Rate is a parameter used to measure the efficiency of a turbine in converting heat energy into electrical energy. The lower the turbine heat rate, the more efficient the turbine. The results show that the thermnal efficiency before and after Combustion inspection has increased after Combustion inspection. From the results of the calculation and analysis of the Heat Rate value, it shows that with the same load of 90 MW, it has decreased from 1628.37 to 1545.51 kJ/kWh after Combustion inspection. And there was an increase in thermal efficiency of 22.10 % to 23,29 %.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | PLTG, Heat Rate, dan Efisiensi Thermal Power Plant, Heat Rate, and Thermal Efficiency |
Subjects: | Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin |
Depositing User: | Nurul Hidayati |
Date Deposited: | 10 Sep 2025 03:55 |
Last Modified: | 10 Sep 2025 03:55 |
URI: | https://repository.itpln.ac.id/id/eprint/790 |