PRAMUDITA, DANIEL EKA and Prabowo, Eri (2024) ANALISA PENGGANTIAN RUNNER PLTMH TENGA AMURANG UNTUK MENINGKATKAN PRODUKSI DI PT PLN (PERSERO) UNIT PELAKSANA PELAYANAN PELANGGAN MANADO. Diploma thesis, ITPLN.
![[thumbnail of 202212540_DANIEL EKA PRAMUDITA.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
202212540_DANIEL EKA PRAMUDITA.pdf
Restricted to Repository staff only
Download (8MB)
Abstract
Listrik sangat penting dalam kehidupan sehari-hari untuk mendukung aktivitas manusia dan meningkatkan taraf hidup. PT. PLN (Persero) memiliki program Net Zero Emission (NZE) Moonshot untuk mengurangi ketergantungan pada energi fosil yang semakin menipis. Salah satu solusi utamanya adalah pemanfaatan energi terbarukan (EBT). Penelitian ini bertujuan mengevaluasi dampak penggantian runner pada PLTMH Tenga Amurang (250 kW) terhadap peningkatan produksi listrik. Data dikumpulkan melalui studi banding, wawancara, diskusi, dan pengamatan langsung, meliputi produksi kWh dan kerusakan material selama 20222023. Hasil penelitian menunjukkan bahwa sebelum penggantian runner, produksi listrik mencapai 142.779 kWh, sementara setelah penggantian meningkat menjadi 942.259 kWh. Peningkatan ini terjadi berkat penggunaan runner baru dengan jumlah blade meningkat dari 10 menjadi 13. Pada Juni 2023, produksi tertinggi tercatat sebesar 91.821 kWh. Studi kasus ini membuktikan bahwa penggantian runner di PLTMH Tenga Amurang secara signifikan meningkatkan produksi listrik, khususnya di PT. PLN (Persero) Unit Pelaksana Pelayanan Pelanggan Manado.
Electricity is essential in daily life to support human activities and improve living standards. PT. PLN (Persero) has launched the Net Zero Emission (NZE) Moonshot program to reduce dependency on diminishing fossil fuels. One of the key solutions is the utilization of renewable energy (RE). This study aims to evaluate the impact of replacing the runner at the Tenga Amurang Micro Hydro Power Plant (PLTMH) with a capacity of 250 kW on electricity production. Data was collected through benchmarking, interviews, discussions, and direct observation, focusing on electricity production(kWh) and material damage during 2022-2023. The results show that before the runner replacement, electricity production reached 142,779 kWh, whereas after the replacement, it significantly increased to 942,259 kWh. This improvement was due to the use of a new runner with an increased number of blades from 10 to 13. In June 2023, the highest production was recorded at 91,821 kWh. This case study proves that the runner replacement at PLTMH Tenga Amurang significantly boosted electricity production, particularly at PT. PLN (Persero) Unit Pelaksana Pelayanan Pelanggan Manado.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | PLTMH, Kavitasi, Runner PLTMH, Kavitasi, Runner |
Subjects: | Skripsi Bidang Keilmuan > Teknik Mesin |
Divisions: | Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin |
Depositing User: | Nurul Hidayati |
Date Deposited: | 10 Sep 2025 04:35 |
Last Modified: | 10 Sep 2025 04:35 |
URI: | https://repository.itpln.ac.id/id/eprint/816 |