NAINGGOLAN, ROPATAR and Kustanrika, Irma Wirantina (2024) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN KOLOM BAJA DAN BALOK BAJA DENGAN METODE WORK SAMPLING PROYEK GEDUNG NUSANTARA 1 MPR/DPR SENAYAN. Diploma thesis, ITPLN.
![[thumbnail of SKRIPSI_ROPATAR NAINGGOLAN_201921069 .pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
SKRIPSI_ROPATAR NAINGGOLAN_201921069 .pdf
Restricted to Repository staff only
Download (5MB)
Abstract
Penelitian ini dilaksanakan pada proyek Gedung Nusantara 1 MPR/DPR Senayan yaitu pada pekerjaan struktur kolom baja dan balok baja. Penelitian ini dilaksanakan untuk dapat mengetahui berapa besarnya produktivitas tenaga kerja pada pekerjaan kolom dan balok yang diamati. Pengamatan dilakukan dengan metode work sampling, dimana aktivitas pekerja diklasifikasikan dalam 3 yaitu waktu efektif, waktu kontribusi dan waktu inefektif. Waktu yang dicatat dapat dianalisis untuk menentukan tingkat efektifitas dalam bekerja (Labour Utilization Rate). Nilai LUR diperoleh dapat digunakan sebagai gambaran seberapa besar tingkat produktivitas tenaga kerja yang diamati. Berdasarkan hasil penelitian, volume pekerjaan kolom baja adalah 1152 kg dan volume pekerjaan sloof baja adalah 1536 kg. Produktivitas tenaga kerja pada pekerjaan sloof adalah 687,7611940 kg/jam, untuk produktivitas tenaga kerja pada pekerjaan kolom baja tanggal 26 desember 2024 adalah 218.1818182 kg/jam, produktivitas tenaga kerja pada tanggal 27 desember 2024 adalah 227.7966102 kg/jam dan produktivitas tenaga kerja pada tanggal 28 desember 2024 adalah 193,6134454 kg/jam. Sedangkan untuk faktor utilitas pekerja (LUR), pada pekerjaan sloof sebesar 76,39%, pada pekerjaan kolom baja tanggal 26 desember sebesar 60,76%, tanggal 27 desember sebesar 70,83%, dan tanggal 28 desember sebesar 66,54%.
This research was conducted on the Gedung Nusantara 1 MPR/DPR Senayan project, specifically on the steel column and steel beam structure work. This research aims to determine the productivity rate of workers in the observed column and beam work.Observations were carried out using the work sampling method, where worker activities were classified into three categories: effective time, contributory time, and ineffective time. The recorded time data were analyzed to determine the level of work efficiency (Labour Utilization Rate). The obtained LUR value serves as an indicator of the observed workforce productivity level. Based on the research results, the volume of steel column work was 1,152 kg, and the volume of steel sloof work was 1,536 kg. The productivity of workers in sloof work was 687.7611940 kg/hour, while the productivity of workers in steel column work on December 26, 2024, was 218.1818182 kg/hour, on December 27, 2024, it was 227.7966102 kg/hour, and on December 28, 2024, it was 193.6134454 kg/hour. As for the Labour Utilization Rate (LUR), the sloof work had a rate of 76.39%, while the steel column work had a rate of 60.76% on December 26, 70.83% on December 27, and 66.54% on December 28."
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Produktivitas, Labour Utilization Rate, Work Sampling, Tenaga Kerja, Kolom, Balok Productivity, Labor Utilization Rate, Work Sampling, Workforce, Column, Beam |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 25 Aug 2025 07:42 |
Last Modified: | 27 Aug 2025 08:02 |
URI: | https://repository.itpln.ac.id/id/eprint/83 |