Drawati, Aisyah and Pantouw, John Paulus (2019) PERENCANAAN HIDROLOGI DAN HIDROLIKA TEROWONGAN PENGELAK SUNGAI BENDUNGAN KARIAN, LEBAK-BANTEN. Diploma thesis, ITPLN.
![[thumbnail of Aisyah Drawati.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
Aisyah Drawati.pdf
Restricted to Repository staff only
Download (2MB)
Abstract
Perkembangan industri dan urbanisasi di Jakarta, Bogor, Tangerang, dan Bekasi berkembang dengan cepat. Menurut analisa pertumbuhan penduduk JABOTABEK akan memiliki lebih dari 50 juta penduduk pada tahun 2025. Urbanisasi dan industrialisasi di daerah ini telah mendorong peningkatan kebutuhan air kota dan industri secara pesat. Pemerintah Indonesia menetapkan rencana induk untuk pasokan air kota dan industri salah satunya dengan membangun Bendungan Karian. Bendungan Karian adalah salah satu bendungan yang dibangun menjadi bendungan multi-purpose yang memiliki banyak fungsi. Sebelum pelaksanaan pembangunan bendungan dimulai maka harus dilakukan pekerjaan pembanguna terowongan pengelak. Terowongan pengelak berfungsi untuk mengalihkan aliran sungai yang melimpas dari bendungan. Dalam skripsi ini dibahas tentang perencanaan hidrologi dan hidrolika pada terowongan pengelak sungai pada Bendungan Karian dengan hasil Qrencana 25 th sebesar 666.06 m³/det, Q50 sebesar 920.04 m³/det.Sedangkan dari analisa hidrolika yang didapat untuk tipe pengaliran dihasilkan tipe aliran super kritis pada jam ke 3 saampai ke 11 pada tahun rencana Q25 sedangkan tipe aliran super kritis pada tahun rencan Q50 pada jam ke 3 sampai ke 13.
The development of industry and urbanisation in Jakarta, Bogor, Tangerang, and Bekasi grew rapidly. According to the growth analysis of JABOTABEK population will have more than 50 million inhabitants in 2025. Urbanisation and industrialization in this area have encouraged the rapidly increasing demand for urban and industrial water. The Indonesian government establishes the master plan for the water supply of the city and the industry, one of them by building a Karian dam. The Karian Dam is one of the dams built into a multi-purpose dam that has many functions. Prior to the implementation of dam construction began, the work should be done by the Circumchement tunnel. The Circumcreting tunnel is functioned to divert the flowing stream from the dam. In this thesis discussed the planning of hydrology and hydraulics in the river-circumscribed tunnel on the Karian dam with the results of the 25-th 666.06 M ³/sec Qplan, Q50 of 920.04 m³/sec As for the hydraulics analysis obtained for the flow type is generated super critical flow type in the 3rd hour Saampai to 11 in the year of the plan Q25 while the type of flow is super critical in the years Q50 in the Hour 3 to 13.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Bendungan, terowongan pengelak, peredam energi, kritis, super kritis. Dams, circumsilent tunnels, energy reducer, critical, super critical. waste ash cane, coconut shell, concrete. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 10 Sep 2025 06:49 |
Last Modified: | 10 Sep 2025 06:49 |
URI: | https://repository.itpln.ac.id/id/eprint/832 |