Aryawan, Moehammad Habibil and Hastanto, Hastanto (2019) Analisis What If Sebagai Metode Antisipasi Keterlambatan Pada Proyek Runway 3 Section 1 Bandar Udara Internasional Soekarno-Hatta, Tangerang, Banten. Diploma thesis, ITPLN.
![[thumbnail of PERSETUJUAN SIDANG SKRIPSI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
PERSETUJUAN SIDANG SKRIPSI.pdf
Download (156kB)
![[thumbnail of SEKOLAH TINGGI TEKNIK.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
SEKOLAH TINGGI TEKNIK.pdf
Download (1MB)
![[thumbnail of semua SKRIPSI.docx]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
semua SKRIPSI.docx
Restricted to Repository staff only
Download (1MB)
Abstract
Sebuah proyek konstruksi terdiri dari berbagai macam aktivitas pekerjaan yang saling berkaitan antara satu dengan yang lainnya. Dalam pelaksanaan proyek konstruksi sering kali terjadi keterlambatan pada salah satu jenis aktivitas pekerjaan yang menyebabkan keterlambatan pada durasi proyek secara keseluruhan. Seorang manajer proyek seharusnya memiliki perencanaan yang matang dalam penjadwalan, serta langkah antisipasi apabila terjadi skenario terburuk dalam pelaksanaan pada proyeknya. Salah satu usaha untuk mengantisipasi keterlambatan durasi pada proyek adalah dengan melakukan percepatan durasi aktivitas pekerjaan pengikut. Untuk mengatasi masalah percepatan durasi aktivitas pekerjaan sebagai langkah antisipasi keterlambatan pada proyek Runway 3 Section 1 Bandar Udara International Soekarno-Hatta adalah Dengan menggunakan Analisis What If yang diterapkan pada jadwal Critical Path Method (CPM) atau metode jalur kritis yaitu suatu metode dalam penjadwalan proyek. Percepatan durasi dilakukan pada aktivitas-aktivitas pengikut dengan menambah jumlah pekerja dan jumlah jam kerja pada aktivitas pekerjaan yang dipercepat. Hasil yang didapatkan dalam melakukan percepatan adalah hampir semua aktivitas yang diasumsikan terlambat mendapatkan solusi dengan ditambahkannya pekerja ataupun jam kerja. Dilakukan perbandingan harga antara biaya penambahan jumlah pekerja dengan biaya penambahan jumlah jam kerja untuk digunakan sebagai pilihan percepatan durasi yang dimana biaya penambahan pekerja selalu lebih kecil dibandingkan dengan biaya penambahan jam kerja.
A construction project consists of various kinds of work activities that are interrelated with one another. In the implementation of construction projects, there is often a delay in one type of work activity which causes a delay in the overall project duration. A project manager should have careful planning in scheduling, as well as anticipatory steps if the worst case scenario occurs in the implementation of the project.One effort to anticipate delays in project duration is to accelerate the duration of follower work activities. To overcome the problem of accelerating the duration of work activities as a step to anticipate delays in the Runway 3 Section 1 project of Soekarno-Hatta International Airport is to use What If Analysis applied to the Critical Path Method (CPM) schedule or critical path method, which is a method in project scheduling. The acceleration of the duration is carried out on the activities of followers by increasing the number of workers and the number of hours worked on the work activities to be accelerated. The results obtained in acceleration are almost all activities that are assumed to be late in getting a solution by adding workers or working hours. A price comparison is made between the cost of adding the number of workers to the cost of adding the number of hours worked to be used as an option to accelerate the duration where the cost of adding workers is always smaller than the cost of adding hours worked.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | percepatan durasi, jadwal cpm, Analisis What If,keterlambatan proyek. project acceleration, CPM scheduling, analysis What if, project delay. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 10 Sep 2025 07:36 |
Last Modified: | 10 Sep 2025 07:36 |
URI: | https://repository.itpln.ac.id/id/eprint/845 |