ANALISIS EFISIENSI SIKLUS BRAYTON PLTG UNIT 2 BLOK 1 PT. PLN NUSANTARA POWER UP MUARA KARANG SEBELUM DAN SESUDAH OVERHAUL COMBUSTION INSPECTION

SIHALOHO, VINCENT DWIROVSKI and NURHASANAH, ROSWATI (2025) ANALISIS EFISIENSI SIKLUS BRAYTON PLTG UNIT 2 BLOK 1 PT. PLN NUSANTARA POWER UP MUARA KARANG SEBELUM DAN SESUDAH OVERHAUL COMBUSTION INSPECTION. Diploma thesis, ITPLN.

[thumbnail of Jurnal_Vincent Dwirovski Sihaloho_202112069.pdf] Text
Jurnal_Vincent Dwirovski Sihaloho_202112069.pdf
Restricted to Repository staff only

Download (654kB)

Abstract

Penelitian ini bertujuan untuk menganalisis efisiensi termal pada Pembangkit Listrik Tenaga Gas dan Uap (PLTGU) di PT PLN Nusantara Power Unit Pembangkitan (UP) Muara Karang sebelum dan sesudah pelaksanaan inspeksi pembakaran (combustion inspection). Efisiensi termal merupakan parameter kunci dalam menilai kinerja sebuah pembangkit listrik, yang dipengaruhi oleh berbagai faktor seperti kondisi mesin, peralatan, dan proses pembakaran. Dalam penelitian ini, dilakukan pengukuran dan analisis data operasional PLTG untuk mengevaluasi perubahan efisiensi termal akibat inspeksi pembakaran. Data yang digunakan meliputi temperatur, tekanan, dan konsumsi bahan bakar sebelum dan sesudah inspeksi. Peneliti bisa mendapatkan hasil penelitian dari efisiensi termal, dari hasil perhitungan sebelum combustion inspection yang diperoleh dari perhitungan beban 87,41 MW sebesar 25,38 %, sedangkan sesudah combustion inspection pada perhitungan beban 87,41 MW sebesar 27,63%. Beban 112,5 MW sebelum combustion inspection memiliki efisiensi thermal sebesar 25,99%, sedangkan sesudah combustion inspection beban 112,5 MW memiliki efisiensi sebesar 27,80%

This study aims to analyze the thermal efficiency of the Gas and Steam Power Plant (PLTGU) at PT PLN (Persero) Nusantara Power Muara Karang Generating Unit (UP) before and after the implementation of combustion inspection. Thermal efficiency is a key parameter in assessing the performance of a power plant, which is influenced by various factors such as engine condition, equipment, and combustion process. In this study, measurements and analysis of PLTG operational data were conducted to evaluate changes in thermal efficiency due to combustion inspection. The data used includes temperature, pressure, and fuel consumption before and after inspection. Researchers can get research results from thermal efficiency, from the calculation results before combustion inspection obtained from the calculation of 87,41 MW load of 25,38%, while after combustion inspection at 87,41 MW load calculation of 27,63 %. 112,5 MW load before combustion inspection has a thermal efficiency of 25,99%, while after combustion inspection 112,5 MW load has an efficiency of 27,80%

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Efisiensi Thermal, Combustion Inspection, Temperatur Ideal Thermal Efficiency, Combustion Inspection, Ideal Temperature
Subjects: Skripsi
Bidang Keilmuan > Teknik Mesin
Divisions: Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin
Depositing User: Nurul Hidayati
Date Deposited: 10 Sep 2025 08:23
Last Modified: 10 Sep 2025 08:23
URI: https://repository.itpln.ac.id/id/eprint/849

Actions (login required)

View Item
View Item