Ramzi, Dicky Septia and Kustanrika, Irma Wirantina (2019) ANALISIS KEBUTUHAN TULANGAN MENGGUNAKAN LINIER PROGRAMING DENGAN MEMPERHITUNGKAN OPTIMASI WASTE MATERIAL BESI TULANGAN PADA PEKERJAAN BALOK, PROYEK PEMBANGUNAN APARTEMEN SOUTHGATE, TANJUNG BARAT, JAKARTA SELATAN. Diploma thesis, ITPLN.
![[thumbnail of COVER.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
COVER.pdf
Download (114kB)
![[thumbnail of ISI SKRIPSI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
ISI SKRIPSI.pdf
Restricted to Repository staff only
Download (1MB)
Abstract
Dalam proyek konstruksi, tulangan besi baja merupakan material yang banyak menimbulkan waste. Oleh karena itu, perlu untuk diteliti waste pada sebuah proyek konstruksi. Salah satu cara untuk mengoptimasi terjadinya waste material tulangan besi yaitu dengan membuat Bar Banding Shedule atau perhitungan kebutuhan bestat besi dengan bantuan linier programming untuk mempermudah dan mengevisiensi potongan tulangan yang nantinya dibutuhkan dilapangan. Dari hasil optimasi yang dilakukan, diperoleh penghematan kebutuhan tulangan pada balok untuk masing masing tipe yakni sebesar 0.27% untuk tulangan D25, 1.36% untuk tulangan D19 dan 1.15% untuk tulangan D13. Hal ini dapat diartikan bahwa penggunaan solver dalam pengoptimasian waste tulangan balok ini cukup efektif jika dibandingkan dengan perhitunga manual dilapangan.
In construction projects, steel reinforcement is a material that causes waste. Therefore, it is necessary to examine waste on a construction project. One way to optimize waste iron reinforcement material is by making a Shedule Appeal Bar or calculating bestat iron requirements with the help of linear programming to simplify and revise the reinforcement pieces that will be needed in the field. From the results of the optimization carried out, obtained savings in the reinforcement needs of the beam for each type that is equal to 0.27% for reinforcement D25, 1.36% for reinforcement D19 and 1.15% for reinforcement D13. This can be interpreted that the use of a solver in optimizing the beam reinforcement waste is quite effective when compared to the manual maintenance in the field.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Optimasi, Bar Banding Schedule, Waste, Linear Programming Optimization, Bar Banding Schedule, Waste, Linear Programming |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 10 Sep 2025 07:43 |
Last Modified: | 10 Sep 2025 07:43 |
URI: | https://repository.itpln.ac.id/id/eprint/850 |