Senjaya, Moch Maulana and Kusumastuti, Dyah Pratiwi (2019) ANALISIS PERENCANAAN TIMBUNAN PADA TANAH LUNAK DALAM PEMBANGUNAN JALAN TOL DEPOK – ANTASARI TAHAP II RUAS BRIGIF - SAWANGAN (Studi kasus : STA 8+500 – 8+750). Diploma thesis, ITPLN.
![[thumbnail of 1. COVER.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
1. COVER.pdf
Download (53kB)
![[thumbnail of 2.LEMBAR PENGESAHAN.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
2.LEMBAR PENGESAHAN.pdf
Download (67kB)
![[thumbnail of 3. LEMBAR PENGESAHAN TIM PENGUJI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
3. LEMBAR PENGESAHAN TIM PENGUJI.pdf
Download (76kB)
![[thumbnail of 4. PERNYATAAN KEASLIAN SKRIPSI MAUL.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
4. PERNYATAAN KEASLIAN SKRIPSI MAUL.pdf
Download (74kB)
![[thumbnail of 4. PERSETUJUAN SIDANG SKRIPSI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
4. PERSETUJUAN SIDANG SKRIPSI.pdf
Download (74kB)
![[thumbnail of 7. HALAMAN PERSETUJUAN PUBLIKASI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
7. HALAMAN PERSETUJUAN PUBLIKASI.pdf
Download (85kB)
![[thumbnail of 8. ABSTRACT (INGGRIS).pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
8. ABSTRACT (INGGRIS).pdf
Download (62kB)
![[thumbnail of BAB I skripsi fix maul.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BAB I skripsi fix maul.pdf
Download (69kB)
![[thumbnail of BAB II SKRIPSI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BAB II SKRIPSI.pdf
Download (909kB)
![[thumbnail of BAB III.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BAB III.pdf
Restricted to Repository staff only
Download (606kB)
![[thumbnail of BAB IV.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BAB IV.pdf
Restricted to Repository staff only
Download (1MB)
![[thumbnail of BAB V.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
BAB V.pdf
Restricted to Repository staff only
Download (78kB)
![[thumbnail of DAFTAR PUSTAKA.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
DAFTAR PUSTAKA.pdf
Download (85kB)
Abstract
Depok City is a city in West Java Province, Indonesia. As the Infrastructure Development in Depok City is rapidly increasing, so the Depok-Antasari toll road construction is built on soft clay soil layers, so that the subgrade has a low carrying capacity that can result in the planning of the embankment having a large compression carried out by research PT Girder Indonesia's laboratory. Therefore it is necessary to plan a pile of basic soil improvement to increase the carrying capacity of the subgrade and accelerate the process of soil compression. So that a preloading method is needed to improve the characteristics of soft soils. For planning the pile on soft soil using manual method and with the help of geostudio / slope w from the calculation analysis that has been done, it is obtained the height of the pile plan (HR) as a load of 9 m with 30 days time. For a long period of decline in original soil without PVD (prefabricated vertical drain) is 300 years, for a time of decline in original soil using PVD 48 weeks or 1 year. On the results of the pile safety factor after PVD is 1,800 with a length of 18m, while for the pile safety factor before PVD is 1,100.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Soft clay soil, settlement, embankment, preloading method, prefabricated vertical drain (PVD), safety factor, geoslope/w. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 11 Sep 2025 02:05 |
Last Modified: | 11 Sep 2025 02:05 |
URI: | https://repository.itpln.ac.id/id/eprint/868 |