Safitri, Debby Maya and Siswoyo, Sriyono D (2017) OPTIMASI WAKTU DAN BIAYA TERHADAP PENAMBAHAN JAM LEMBUR, TENAGA KERJA, SERTA ALAT BERAT DENGAN METODE TIME COST TRADE OFF (STUDI KASUS : PEKERJAAN STRUKTUR BAWAH PROYEK PEMBANGUNAN DOUBLE – DOUBLE TRACK MANGGARAI - JATINEGARA). Diploma thesis, ITPLN.
COVER.pdf
Download (109kB)
kata pengantar.pdf
Download (80kB)
KET.PUBLIKASI.pdf
Download (101kB)
LEMBAR PENGESAHAN.pdf
Download (100kB)
PENGESAHAN.pdf
Download (109kB)
PERNYATAAN ASLI SKRIPSI.pdf
Download (82kB)
UCAPAN TERIMA KASIH.pdf
Download (128kB)
abstrak.pdf
Download (160kB)
BAB 1.pdf
Download (124kB)
BAB II.pdf
Download (228kB)
BAB III.pdf
Restricted to Registered users only
Download (739kB)
BAB IV.pdf
Restricted to Registered users only
Download (536kB)
BAB V.pdf
Restricted to Registered users only
Download (77kB)
D.PUSTAKA.pdf
Download (11kB)
DAFTAR ISI.pdf
Download (129kB)
LAMPIRAN 2.pdf
Download (114kB)
LAMPIRAN 2.pdf
Download (114kB)
Abstract
Percepatan proyek tidak dapat dilaksanakan tanpa adanya suatu perencanaan yang baik. Alternatif yang bisa digunakan untuk melakukan percepatan proyek adalah dengan penambahan jam lembur, tenaga kerja serta alat berat. Salah satu metode yang sering digunakan untuk menganalisis percepatan proyek adalah Pertukaran Waktu dan Biaya (Time Cost Trade Off). Proyek Pembangunan Double – Double Track Manggarai – Jatinegara untuk pekerjaan struktur bawah dipilih karena adanya permintaan dari pihak Owner untuk melakukan percepatan penyelesaian proyek untuk mengejar keterlambatan dari waktu rencana yang tercantum dalam kontrak. Perhitungan dimulai dengan mencari lintasan kritis menggunakan CPM . Dari hasil analisis biaya mempercepat durasi proyek dengan penambahan jam kerja (lembur) lebih rendah dibandingkan dengan penambahan tenaga kerja serta alat berat dan biaya yang harus dikeluarkan apabila proyek mengalami keterlambatan dan dikenakan denda.
Project acceleration can not be implemented without a good plan. The alternative that can be used to accelerate the project is by adding overtime, labor and heavy equipment. One of the most common methods used to analyze project acceleration is Time Cost Trade Off. Double – Double Track Manggarai – Jatinegara Project Development is selected for requests from the Owner to accelerate the completion of the project to pursue the delay of the time of the plan specified in the contract. The calculation begins by searching for a critical path using CPM. From the analysis cost results accelerate the duration of the project by overtime than the addition of labor and equipment and the costs incurred when the project is delayed and struck forfeit.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Optimasi Waktu, Biaya, Time Cost Trade Off Time Optimization, Cost, Time Cost Trade Off |
| Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
| Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
| Depositing User: | Sudarman |
| Date Deposited: | 13 Sep 2025 08:25 |
| Last Modified: | 13 Sep 2025 08:25 |
| URI: | https://repository.itpln.ac.id/id/eprint/1025 |