Hadi, Wahyu Prasetyo and Artiani, Gita Puspa (2018) IDENTIFIKASI FAKTOR RISIKO DALAM MENGELOLA PEKERJAAN SUBKONTRAKTOR (Studi Kasus Proyek 6 (enam) Ruas Jalan Toll dalam kota Jakarta). Diploma thesis, ITPLN.
![[thumbnail of 1. Cover.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
1. Cover.pdf
Download (64kB)
![[thumbnail of 2. Lembar Lembar.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
2. Lembar Lembar.pdf
Download (164kB)
![[thumbnail of 6. FULL Skripsi Wahyu.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
6. FULL Skripsi Wahyu.pdf
Restricted to Registered users only
Download (665kB)
![[thumbnail of 7. Daftar Pustaka.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
7. Daftar Pustaka.pdf
Download (33kB)
![[thumbnail of 8. Riwayat Hidup.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
8. Riwayat Hidup.pdf
Download (55kB)
Abstract
Pada proyek enam ruas jalan tol dalam kota jakarta kontraktor menyerahkan sebagian pekerjaan kepada subkontraktor, pekerjaan yang dilaksanakan oleh sublontraktor apabila tidak dikelola dengan baik maka sangat memungkinkan terjadinya risiko pada pelaksanaan pekerjaan yang disubkonkan, karena akan mengakibatkan pekerjaan proyek menjadi kurang maksimal sehingga dapat menurunnya produktivitas terhadap pekerjaan, dan dapat berdampak pada waktu pelaksanaan proyek. Oleh karena itu perlu dulakukan pengidentifikasian risiko terhadap pelaksanaan pekerjaan subkontraktor. Pengidentifikasian risiko dilakukan dengan studi literatur serta wawancara dengan kontraktor sebagai pihak yang sering berada dilapangan. Dari hasil identifikasi didapatkan 31 faktor risiko yang terbagi menjadi 7 kategori. Faktor-faktor risiko yang dominan adalah Kerusakan alat sehingga target pekerjaan tidak tercapai, keterbatasan tenaga kerja di lapangan yang berakibat produktifitas tidak bisa maksimal, masih adanya lahan yang belum bebas saat pelaksanaan pekerjaan masih berjalan, kurangnya perhatian dan aplikasi aspek aspek K3 di lapangan seperti masih banyak pekerja yang tidak memakai masker, tidak memakai sarung tangan untuk pekerjaan pembesian, maka perlu respon/tindakan yang berupa persepsi dari pakar ahli, dan studi literatur untuk meminimalisir risiko.
In the project of six inner-city toll road sections, Jakarta contracted the job of subcontractor. the work carried out of sub contractor if it is not managed properly, it is very possible that the risk in the implementation of the sub-project is carried out, because it will becoming maximal less and productivity can be reduced to the work and can appear at the time of project implementation. Therefore, it is necessary to identify risks to the implementation of subcontractor work. Identification of risks is carried out with literature studies and interviews with contractors as those who are often in the field. From the identification results obtained 31 risk factors which are divided into 7 categories The dominant risk factors are damage to the equipment so that the work target is not achieved, limited workforce in the field which results in maximum productivity. There is still land that is not free during the implementation of mass work, Lack of attention and application of aspects of HSE in the field such as many workers who do not wear masks, do not wear gloves for cleaning work. hence the need for responses in the form of perceptions from expert experts, and literature studies to minimize risk.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Resiko,identifikasi risiko, subkontraktor , mitigasi risiko Risk analysis, risk identification, subcontractors, risk mitigation |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 13 Sep 2025 08:49 |
Last Modified: | 13 Sep 2025 08:49 |
URI: | https://repository.itpln.ac.id/id/eprint/1028 |