PERBANDINGAN BIAYA DAN WAKTU PADA ERECTION BOX GIRDER SISTEM LIFTING FRAME DAN LAUNCHING GANTRY (Studi Kasus: Proyek Jalan Layang Khusus Busway Kapten Tendean – Blok M – Cileduk)

Fitriani, Elsa and Hastanto, Hastanto (2017) PERBANDINGAN BIAYA DAN WAKTU PADA ERECTION BOX GIRDER SISTEM LIFTING FRAME DAN LAUNCHING GANTRY (Studi Kasus: Proyek Jalan Layang Khusus Busway Kapten Tendean – Blok M – Cileduk). Diploma thesis, ITPLN.

[thumbnail of 1. COVER.pdf] Text
1. COVER.pdf

Download (51kB)
[thumbnail of 2. Lembar Pengesahan.pdf] Text
2. Lembar Pengesahan.pdf

Download (46kB)
[thumbnail of 3. Lembar Pengesahan Tim Penguji.pdf] Text
3. Lembar Pengesahan Tim Penguji.pdf

Download (76kB)
[thumbnail of 4. Pernyataan Keaslian Skripsi.pdf] Text
4. Pernyataan Keaslian Skripsi.pdf

Download (73kB)
[thumbnail of 5. Ucapan Terima Kasih.pdf] Text
5. Ucapan Terima Kasih.pdf

Download (30kB)
[thumbnail of 6. Pernyataan Persetujuan.pdf] Text
6. Pernyataan Persetujuan.pdf

Download (75kB)
[thumbnail of 8. Abstrak english.pdf] Text
8. Abstrak english.pdf

Download (31kB)
[thumbnail of 9. DAFTAR ISI.pdf] Text
9. DAFTAR ISI.pdf

Download (39kB)
[thumbnail of 11. BAB 1.pdf] Text
11. BAB 1.pdf

Download (92kB)
[thumbnail of 12. BAB 2.pdf] Text
12. BAB 2.pdf

Download (2MB)
[thumbnail of 13. BAB 3.pdf] Text
13. BAB 3.pdf
Restricted to Registered users only

Download (128kB)
[thumbnail of 14. BAB 4.pdf] Text
14. BAB 4.pdf
Restricted to Registered users only

Download (492kB)
[thumbnail of 15. BAB 5.pdf] Text
15. BAB 5.pdf
Restricted to Registered users only

Download (88kB)
[thumbnail of 16. Daftar Pustaka.pdf] Text
16. Daftar Pustaka.pdf

Download (44kB)
[thumbnail of 17. Daftar Riwayat Hidup.pdf] Text
17. Daftar Riwayat Hidup.pdf

Download (42kB)
[thumbnail of 18. lampiran 1.pdf] Text
18. lampiran 1.pdf

Download (56kB)
[thumbnail of 19. lampiran 2.pdf] Text
19. lampiran 2.pdf

Download (380kB)

Abstract

There are 2 kind of concrete box girder in fly over, precast segment and cast in site segment. Box girder precast installation can use launching gantry and lifting frame. Fly over trunojoyo package from pier 7 to pier 27 using launching gantry. While, fly over Taman Puring Package from pier 1 to pier 33 using lifting frame method. The result of the research are, Gantry Launcher need 21 days from segmen P7 to P8 with Rp. 1.495.158.500,00 for the cost. While, Lifting frame only need 18 days from segmen P7 to P8 include stressing girder, grouting girder and erection girder with Rp. Rp.1.471.525.000,00 for the cost. There is no big different between those heavy equipment, but launching gantry is more effective.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Box Girder, Erection, Launching Gantry, Lifting Frame, Comparison, Costs, Time.
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 13 Sep 2025 10:10
Last Modified: 13 Sep 2025 10:10
URI: https://repository.itpln.ac.id/id/eprint/1032

Actions (login required)

View Item
View Item