Hidayat, Luthfi and Sepriyanna, Irma (2024) ANALISA PERHITUNGAN PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PONDASI BORE PILE PROYEK BSI TOWER. Diploma thesis, ITPLN.
![[thumbnail of SKRIPSI_LUTHFI HIDAYAT_202021095.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
SKRIPSI_LUTHFI HIDAYAT_202021095.pdf
Restricted to Repository staff only
Download (6MB)
Abstract
Pondasi Bore Pile dapat didefinisikan sebagai salah satu jenis pondasi dalam yang terbuat dari beton bertulang yang memiliki bentuk seperti tabung dengan diameter tertentu. Penelitian ini dilakukan untuk mengamati dan menghitung produktivitas alat berat pada pekerjaan pondasi Bore pile proyek BSI Tower yang berlokasikan di Jl. Medan Merdeka Selatan, Kecamatan Gambir, Jakarta Pusat. Alat berat yang diteliti pada penelitian ini adalah Hydraulic Drilling Rig, Tower Crane, dan Truck Mixer. Mengamati dan menghitung produktivitas alat berat sangat penting dilakukan untuk menentukan keberhasilan suatu proyek karena akan berpengaruh pada penjadwalan dan pembiayaan proyek. Perhitungan serta pengolahan data dilakukan setelah mendapatkan data primer yang didapatkan dari pengamatan langsung di lapangan serta data sekunder yang diperoleh dengan mengumpulkan data dari pihak yang berwenang. Dari penelitian yang dilakukan menunjukkan bahwa pada pekerjaan pondasi Bore pile titik 290 – titik 300 untuk durasi pada alat berat Hydraulic Drilling Rig di lapangan adalah 222 jam 40 menit, Truck Mixer 5903 menit, dan Tower Crane 27 menit 45 detik. Untuk volume galian adalah 514,177 m3, volume tulangan yang diangkut 2605,644 kg, dan volume ready mix sebesar 507 m3. Setelah dihitung maka didapatkan nilai produktivitas alat berat Hydraulic Drilling Rig adalah sebesar 3,58 m/jam, Truck Mixer sebesar 0,556 m3/menit, dan Tower Crane sebesar 95,04 kg/menit.
Bore Pile foundation can be defined as a type of deep foundation made of reinforced concrete that has a cylindrical shape with a certain diameter. This research was conducted to observe and calculate the productivity of heavy equipment in the Bore pile foundation work of the BSI Tower project located on Medan Merdeka Selatan street, Gambir District, Central Jakarta. The heavy equipment studied in this research are the Hydraulic Drilling Rig, Tower Crane, and Truck Mixer. Observing and calculating the productivity of heavy equipment is very important to determine the success of a project because it will affect the scheduling and financing of the project. Calculations and data processing are carried out after obtaining primary data collected from direct field observations and secondary data obtained by gathering information from the relevant authorities. From the research conducted, it shows that for the Bore pile foundation work at points 290 – 300, the duration for the Hydraulic Drilling Rig on site is 222 hours 40 minutes, Truck Mixer 5903 minutes, and Tower Crane 27 minutes 45 seconds. For the excavation volume, it is 514,177 m3, the volume of reinforcement transported is 2605,644 kg, and the ready mix volume is 507 m3. After calculation, the productivity value of the Hydraulic Drilling Rig is 3.58 m/hour, the Truck Mixer is 0.556 m³/minute, and the Tower Crane is 95.04 kg/minute.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Produktivitas Alat Berat ,Pondasi Bore Pile, Proyek Konstruksi , Hydraulic Drilling Rig, Truck Mixer, Tower Crane, Manajemen Konstruksi , Perhitungan Produktivitas , Waktu Siklus , Volume Pekerjaan , Efisiensi Alat Berat, Studi Kasus Proyek , Penjadwalan Proyek , Peralatan Konstruksi Heavy Equipment Productivity, Bore Pile Foundations, Construction Projects, Hydraulic Drilling Rigs, Truck Mixers, Tower Cranes, Construction Management, Productivity Calculations, Cycle Times, Work Volume, Heavy Equipment Efficiency, Project Case Studies, Project Scheduling, Construction Equipment |
Subjects: | Bidang Keilmuan > Heavy Equipment Bidang Keilmuan > Teknik Sipil Bidang Keilmuan > Manajemen Konstruksi Bidang Keilmuan > Productivity Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 25 Aug 2025 10:33 |
Last Modified: | 27 Aug 2025 08:01 |
URI: | https://repository.itpln.ac.id/id/eprint/111 |