ADITYA, DHANU KRISNA and Basri, Hasan (2015) STUDI TENTANG KONDISI HASIL PENGUKURAN RATIO, TAHANAN ISOLASI, TANGEN DELTA ISOLASI BELITAN DAN BUSHING PADA TRAFO IBT 1 500/150 kV DALAM KEADAAN PADAM PADA GITET GANDUL. Diploma thesis, ITPLN.
1. Cover judul.pdf
Download (76kB)
2. PENGESAHAN.pdf
Download (6kB)
3. PERNYATAAN KEASLIAN SKRIPSI.pdf
Download (47kB)
4. UCAPAN TERIMA KASIH.pdf
Download (4kB)
5. DAFTAR ISI fix trafo pengujian.pdf
Download (30kB)
6. ABSTRACT english pengujian trafo.pdf
Download (48kB)
6. ABSTRAK PENGUJIAN TRAFO.pdf
Download (49kB)
7. DAFTAR GAMBAR.pdf
Download (8kB)
8. DAFTAR TABEL.pdf
Download (50kB)
9. Daftar konsultasi Danker.pdf
Download (95kB)
10. DAFTAR PUSTAKA.pdf
Download (5kB)
Skripsi Bab I pengujian trafo.pdf
Download (13kB)
Skripsi BAB II PENGUJIAN TRAFO.pdf
Download (208kB)
Skripsi BAB III PENGUJIAN TRAFO.pdf
Download (324kB)
Skripsi BAB IV PENGUJIAN TRAFO.pdf
Download (453kB)
Skripsi BAB IV PENGUJIAN TRAFO.pdf
Download (453kB)
Skripsi BAB V Pengujian trafo.pdf
Download (7kB)
Abstract
Sebagai perusahaan listrik milik negara, PT PLN persero berusaha untuk menyuplai energi listrik secara optimal. Untuk menjaga kualitas energi listrik yang di salurkan, sistem pengaman dan pemeliharaan peralatan listrik suatu gardu induk sangat di perlukan. Pengujian pada Transformator dilakukan untuk menjaga durability dan reliability (Waktu) dari sebuah sistem tenaga listrik terutama transformator yang berperan penting dalam penyaluran tenaga listrik. Untuk itu diperlukan pengujian transformator daya secara berkala. Sehingga jika di temukan ketidaknormalan pada suatu transformator, dapat segera dilakukan penyelidikan lebih lanjut. Dengan demikian tidak akan terjadi kegagalan saat transformator beroperasi.
As state- owned enterprises, PT PLN persero manage to supply the electric energy optimally. In order to utilize dan maintain the quality of the electrical energy, a system of maintenance and protection if substation electrical equipment are required. Transfomer testing performed to maintain the durability and reliability (time) of power system, especially power transformers that have an important role in the distribution of electricity. Therefor, periodic testing of power transformer is neede, so that in case there is an abnormality on the transformer, a further investigation can be done immediately., thus the failure of the transformer during operation can be avoided.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Transformator, pengujian Transformers, Testing |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 09 Dec 2025 15:21 |
| Last Modified: | 09 Dec 2025 15:21 |
| URI: | https://repository.itpln.ac.id/id/eprint/4509 |