Arifudin, Muhammad and Susanto, djoko (2017) PENGARUH PEMASANGAN PLTS 3 MWp YANG DI GRID PADA REL 20 Kv DI GI PRINGGABAYA TERHADAP OPERASI SISTEM LOMBOK. Diploma thesis, ITPLN.
Cover.pdf
Download (236kB)
pengesahan.pdf
Download (261kB)
Daftar Isi.pdf
Download (210kB)
BAB 1.pdf
Download (153kB)
BAB II.pdf
Download (614kB)
BAB III.pdf
Restricted to Registered users only
Download (657kB)
BAB IV.pdf
Restricted to Registered users only
Download (1MB)
BAB V.pdf
Restricted to Registered users only
Download (144kB)
Daftar Pustaka.pdf
Download (144kB)
Daftar Riwayat Hidup.pdf
Download (482kB)
DAFTAR KONSULTASI SKRIPSI.pdf
Download (244kB)
Abstract
Pembangkit Listrik Tenaga Surya (PLTS) On Grid merupakan Teknologi yang menggunakan sel photovoltaik (sel surya) untuk mengubah sinar matahari (surya) menjadi energi listrik. Pembangkit listrik tenaga surya (PLTS) On-Grid adalah jenis PLTS yang mampu terkoneksi langsung dengan pembangkit listrik PLN, sehingga dapat terkoneksi dengan jaringan. Energi listrik yang dihasilkan oleh panel surya dapat langsung digunakan ke beban dan selebihnya akan disalurkan ke dalam jaringan PLN. Pembangkit Listrik Tenaga Surya (PLTS) jenis ini digunakan sebagai dukungan daya pada pembangkit-pembangkit tenaga besar lainnya, terutama diesel. Hal ini dimaksudkan untuk efisiensi energi sumber daya tak terbarukan yang digunakan oleh banyak pembangkit di Indonesia, dengan beroperasinya PLTS 3 MWp yang di grid pada rel 20 kV di GI Pringgabaya terhadap sistem operasi Lombok akan membantu memenuhi kebutuhan listrik di Lombok.
Solar Power Plant (PLTS) On Grid is a technology that uses photovoltaic cells (solar cells) to convert sunlight (solar) into electrical energy. Solar power plants (PLTS) On-Grid is a type of PLTS is able to connect directly with electricity generation, so that it can connect to the network. The electrical energy generated by the solar panels can be directly used to load and the rest will be channeled into the grid. Solar Power Plant (SPP) is used as a support type of power in large power stations more, especially diesel. It is intended for the energy efficiency of non-renewable resources that are used by many plants in Indonesia, with the operation of 3 MWp solar power are on the grid at 20 kV rail in GI Pringgabaya to Lombok operating system will help meet electricity needs in Lombok.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS, ON GRID, Lombok, GI Pringgaba PLTS, ON GRID, Lombok, GI Pringgabaya |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 12 Dec 2025 06:02 |
| Last Modified: | 12 Dec 2025 06:02 |
| URI: | https://repository.itpln.ac.id/id/eprint/4587 |
