ARKAN, ARDO FAIQ and Hariyati, Rinna (2018) PERBAIKAN JATUH TEGANGAN PADA JARINGAN DISTRIBUSI 20 KV DI DAERAH PLN RAYON BOROBUDUR AREA MAGELANG. Diploma thesis, ITPLN.
1. COVER.pdf
Download (232kB)
Lembar Pengesahan.pdf
Download (208kB)
2 pengesahan abstrak dan lain lain.pdf
Download (619kB)
3~BAB I PENDAHULUAN.pdf
Download (402kB)
4~BAB II LANDASAN TEORI.pdf
Download (1MB)
5~BAB III CARA PENULISAN.pdf
Restricted to Registered users only
Download (810kB)
6~BAB IV PEMBAHASAN.pdf
Restricted to Registered users only
Download (988kB)
7~BAB V KESIMPULAN DAN SARAN.pdf
Restricted to Registered users only
Download (387kB)
8~Daftar Pustaka.pdf
Download (386kB)
Abstract
Dengan pertumbuhan pemanfaatan listrik yang semakin pesat, pelanggan daripada PT.PLN (PERSERO) Rayon Borobudur semakin bertambah, dengan semakin bertambahnya pelanggan yang ada di PLN Rayon Borobudur, kualitas pasokan daya pada saluran tersebut harus semakin baik, faktor yang memperngaruhi buruknya pasokan daya listrik adalah jatuh tegangan pada suatu saluran. Beban, dan panjang jaringan sangat berpengaruh terhadap jatuh tegangan yang terjadi, tetapi besarnya suatu beban lebih berpengaruh terhadap jatuh tegangan dibandingkan dengan panjang jaringan. Dengan demikian, jatuh tegangan tersebut harus segera diatasi, Dalam kasus ini, Jatuh tegangan telah menyentuh angka 15,7 %, Solusi yang memungkinkan untuk memperbaiki tegangan di saluran tersebut adalah menggunakan metode pemasangan kapasitor di jaringan, karena dengan memasang kapasitor sebesar 7,963 microfarrad penambahan tegangan di ujung pada tiang M3-418-82-82 bisa mencapai 2,2 %. Dengan melakukan simulasi pemasangan satu buah kapasitor di berbagai tempat, tempat paling efektif dilakukan adalah dengan memasang di tiang M3-334, karena M3-334 berada di tengah tengah dari kapasitas beban yang terpakai. Dengan melakukan pemasangan dua buah kapasitor yang identik di tiang M3-334 dan M3-295-1 penambahan tegangan bisa mencapai 5,4 %. Hal tersebut dapat meningkatkan kualitas tegangan menjadi lebih baik, dibanding dipasang satu buah kapasitor.
With the rapid growth of electricity usage, customers of PT.PLN (PERSERO) Rayon Borobudur are increasing, with the increasing number of existing customers in PLN Rayon Borobudur, the power supply quality of those channels should be better, the factors that affect the bad power supply are the voltage drop across a channel. The load, and the length of the network greatly affect the voltage drop that occurs, but the magnitude of a load is more influential to the voltage drop than the network length. Thus, the voltage drop should be overcome immediately. In this case, the voltage drop has touched 15.7%. The possible solution to fix the voltage in the channel is to use the method of mounting the capacitor in the network, because by installing a capacitor of 7.963 microfarrad the addition of voltage at the end of the pole M3-418-82-82 could reach 2.2%. By simulating the installation of one capacitor in various places, the most effective place to do is to install on pole M3-334, because M3-334 is in the middle of the load capacity used. By installing two identical capacitors at the M3-334 and M3 295-1 poles, the addition of voltage could reach 5.4%. This can improve the quality of the voltage to be better, compared to installed a single capacitor.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Drop Voltage, Additional Voltage, Support Voltage Jatuh Tegangan, Pemasangan kapasitor, Penambahan Tegangan |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 18 Feb 2026 03:14 |
| Last Modified: | 18 Feb 2026 03:14 |
| URI: | https://repository.itpln.ac.id/id/eprint/5075 |
